Download presentation
Presentation is loading. Please wait.
Published byNoel Wade Modified over 9 years ago
1
NERC Tools – Wide Area Real Time Monitoring Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review
2
Page 1 12/09/02 Review and Status of NERC Tools - Outline ACE-Frequency Tool Functional Goals Development Timeframe Wide-Area, Multi-Metric Visualization - NPCC CPS1 and CPS Monitoring – 10-Minutes, 1-Day Expanded ACE-Frequency Correlation Visualization Demo
3
Page 2 12/09/02 ACE-Frequency Tool Functional Goals Improve Reliability Coordinators monitoring of interconnection ACE-Frequency with a real-time tool Automatic early notification and alarming for interconnection abnormal frequencies Reduce time to search for interconnections abnormal frequency root causes – from months to minutes Improve Wide-Area Control Monitoring Improve analysis of Interconnections ACE-Frequency relationships
4
Page 3 12/09/02 NERC ACE-Frequency Real Time Monitoring System - Timeframes December 2002 August 2002 Released Automatic Abnormal Frequency Notification July 2003 Implemented NPCC Wide- Area, Multi- Metric Visualization December 2003 Implemented CPS1 and CPS2 Monitoring And ACE- Frequency Correlation Visuals March 2004 Released to Reliability Coordinators February 2004 Deliver Release 2 Reliability Coordinators Training
5
Page 4 12/09/02 NPCC Wide-Area, Multi Metric Visualization
6
Page 5 12/09/02 CPS1 and CPS2 Monitoring 1-Day and 10-Minutes
7
Page 6 12/09/02 Expanded ACE-Frequency Correlation Visual
8
Page 7 12/09/02 Demo Expanded ACE-Frequency Real Time Monitoring Tool
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.