1 Chapter 3 An Introduction to Operations Management

2 How to Create a Process Flow Diagram
2nd Stage FB Reactor 1st Stage CFB Reactor CFB Preheater Inclined Bucket Elevator ~ 110 m Briquetting Plant Process Gas Heat Exchanger Process Gas Compressor Electrical Substation& Control Room Iron Ore Fines Fired Gas Heaters HBI Product ~ 160 m

3 How to Create a Process Flow Diagram
Pile of Iron ore fines Pre-Heater Briquet- ting Flash heater Dis- charge Finished goods Lock Hoppers 1st Reactor 2nd

4 Key-points in Process Analysis
Simplify a complex process using a process flow diagram Bottleneck analysis: analyze the process by looking at the bottleneck Bottleneck may depend on the product mix Time to complete X units Starting with a loaded system: Starting with an empty system - For continuous flow processes: (X-1) = X - If capacity constrained, flow rate is dictated by the bottleneck

5 Flow Rate R Demand vs. Capacity Constraints
Capacity constrained Demand constrained Demand constrained Bottleneck (Capacity) Bottleneck (Capacity) Input Input Flow Rate Flow Rate Flow Rate Flow Rate Demand Excess Capacity Excess Capacity Demand Flow Rate=Min{Demand, Capacity}

6 Process Utilization and Capacity Utilization
Utilization: How much is produced relative to what could be produced Can be computed for an entire process and for each resource in a process Maximum values?

7 How To Conduct a Process Analysis
Use demand to compute the implied utilization levels Compute the capacity for each of the resources Identify the flow unit Prepare a process flow diagram Compute performance measures Identify the bottleneck Use different colors to mark flow units Note that capacity levels may differ depending on product type Step with highest implied utilization Compute workload across all product types Extensions Required for working With multiple flow units

8 A finance company receives 1,000 loan applications per 30 day working month and makes accept/reject decisions based upon a thorough review. On average, 20% of all applications receive approval. An internal audit revealed that the company has 500 applications in process at various stages. In response to customer complaints, the company forms an initial review team to pre-process all applications. Each application will be categorized either A (excellent), B (needs more detailed review), or C (reject). On average 25% of the applications are type A, 25% are type B, and 50% are type C. 70% of type A and 10% of type B applications are approved on review. Internal audit checks show that 200 applications are with the initial review team, 25 with the type A team, and 150 with the type B team. Has customer service improved? Why?

9 A hospital ER is currently organized so that all patients register through an initial check-in process. At his turn, each patient is seen by a doctor and then exits the process, either with a prescription or with admission to the hospital. Currently, 50 people per hour arrive at the ER, 10% of whom are admitted to the hospital. On average, 30 people are waiting to be registered and 40 are registered and waiting to see a doctor. The registration process takes, on average, 2 minutes per patient. Among patients who receive prescriptions, average time spent with a doctor is 5 minutes. Among those admitted to the hospital, average time is 30 minutes. On average, how long does a patient stay in the ER? how many patients are being examined by doctors? how many patients are in the ER?