Download presentation
Presentation is loading. Please wait.
Published byConrad Berry Modified over 9 years ago
1
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India
2
Energy scenario in India At the present growth rate, Indian economy will double every eight years Growing population Reaching well above per capita world average consumption
3
Nuclear energy is to meet 25% to 50% of the total energy requirement Nuclear capacity will reach 20 Gwe and more by 2020 200 Gwe and above generation capacity is targeted by the middle of the century
4
Large nuclear energy requirement Limited Uranium resources
5
Spent Fuel is a resource for India All spent fuel will be reprocessed Storage of spent fuel is an interim activity
6
Indian three stage programme envisages
7
I Stage :Pressurized Heavy water reactor with Natural Uranium fuel Interim storage in spent fuel storage pools and subsequent reprocessing
8
II Stage : U-Pu based Fast Breeder Reactors based on MOX/metallic fuel Interim storage of spent fuel in reactor/water pool & Reprocessing in fast reactor fuel cycle facilities.
9
III Stage: Th-Pu and Th-U233 (MOX) based reactors Interim storage of above fuel and subsequent reprocessing of Th-Pu-U233 or Th-U233 fuel
10
Reprocessing of short cooled fuel Aqueous reprocessing of oxide fuel Aqueous/Pyro chemical reprocessing for metallic fuel Fast reactor fuel reprocessing
11
Fast reactor spent fuel storage Initial cooling in reactor Sodium removal Interim Storage in water pools
12
Thorium fuel reprocessing Three component reprocessing, Th – Pu –U233 Two component reprocessing, Th – U233 U232 related issues Thorium storage
13
Recent nuclear agreements opened up possibility for LWRs of various types based on enriched Uranium Interim storage and subsequent reprocessing of oxide spent fuel ( High burnup fuel)
14
Pressurized Heavy Water Fuel using Recycled Uranium (oxide) Uranium in spent fuel of LWRs is slightly enriched. Suitable for use in PHWRs. Interim storage and Reprocessing of Recycled Uranium based Spent Fuel
15
Other impact of nuclear agreement is availability of Natural Uranium from foreign sources PHWRs based on natural Uranium obtained from foreign sources Interim storage and reprocessing of spent fuel
16
Spent fuel storage pool Intermediate storage Adequate cooling period Water cooled Buffer for the period between discharge from reactor and reprocessing
17
Storage period for spent fuel Longer storage of spent fuel simplifies the reprocessing and waste management systems Shorter storage period results in earlier availability of Pu for power generation Early reprocessing would require storage of high level waste for longer period before vitrification
18
Reprocessing requirements Natural Uranium (Indian) - PHWR Natural Uranium (Foreign) - PHWR Enriched Uranium- LWRs of four types Recycled Uranium(LWR fuel repro.) - PHWR Fast reactor MOX fuel Fast reactor metallic fuel Th – Pu – U233 fuel Th – U233 fuel
19
Waste management High level waste is vitrified and stored in interim storage facility Cesium and Strontium recovery is planned
20
Spent fuel Transportation All transportation will be through land routes using transfer casks and trailers meeting all regulatory requirements For Coastal sites Reprocessing facilities are co-located with power reactors. This will minimize fuel transportation in public domain
21
Larger size Integrated Nuclear Recycle Plant *So far smaller size reprocessing plants were co-located with waste management and fuel fabrication facilities *Future plants will be based on integrated facility for reprocessing and waste management. Fuel fabrication facility will also be integrated in most cases
22
Challenges : construction and operation of larger size plants Extension of available technology; for low and high burn up fuel Use of newer equipment Cost reduction
23
Reprocessing and fabrication of metallic fuel Pyro – chemical technique for reprocessing Electro reduction technique for conversion from oxide to metal Metallic fuel fabrication Commercial scale operation
24
Present activities in the back end Operation of small size plants Construction and commissioning of two more reprocessing plants and associated facilities (augmentation activities) Design and construction two large size integrated plants, one for PHWR and the other for fast reactor spent fuel Plant designs aim at significant reduction in discharges & improvement in safety & security
25
Safety Guides Comprehensive safety codes and guides are required for the back end of fuel cycle Should cover reprocessing,waste management and repository
26
Conclusion Uranium Resource constraint ; Countries aiming large and sustained nuclear generation has to opt for closed fuel cycle Waste volume; Significant reduction in waste volume is possible only through closed fuel cycle route Indian nuclear recycle programme is poised for major expansion, matching the enhanced power generation plans
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.