Software Safety Risk Evaluation (SSRE) Process SAŠA ŠPILER METHOD ENGINEERING UTRECHT, APRIL 2014
2
Content What is SSRE process? Phases PDD and example Related literature
3
Software Safety Risk Evaluation process Represented in 2010 (18th IEEE International Requirements Engineering Conference) Based on: SEI Software Risk Evaluation (SRE) developed in 1992 It is a process used for identification, analysis, consolidation and mitigation of software safety risks (Hill & Talley, 2010).
4
Software Safety Risk Evaluation process SSRE USAGE: 4 projects at 3 NASA Centres AUTHORS: JANICE HILL SCOTT TILLEY Works at IV&V Facility at NASA Professor of Software Engineering in a Department of Computer Sciences at Florida Institute of Technology
5
Phases Detection Risk specification Assessmen t ConsolidationMitigation 2 34 5 1 5
6
PDD
7
PHASE 1: DETECTION Project Profile Safety Related Questions Risks
8
PHASE 2: RISK SPECIFICATION PerformanceSupport Cost Schedule ProjectPerformanceSupportCostSchedule ATCS3077333
9
PHASE 3: ASSESSMENT MAGNITUDE 1 7 Catastrophic * IMPACT Critical Marginal Negligible Likely LIKELIHOOD Probable Possible Unlikely Improbable RISK PROFILE low high
10
PHASE 3: ASSESSMENT Project1234567 ATCS 202329331661 lowhigh
11
PHASE 4: CONSOLIDATION Risk Candidates Priority Ranking (1-5) Project12345 ATCS 194051711
12
Safety Air Traffic Control Procedure Restart Safety-Critical Assurance System Hazard Analysis PHASE 5: MITIGATION IMPORTANCE 1. 2. 3. RISK AREA
13
Related Literature SEI safety requirements evaluation process Legacy System Risk Database (LSRD) tool
14
Questions?