Download presentation
Presentation is loading. Please wait.
Published byCecilia Fisher Modified over 9 years ago
1
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF SITE REPORT Corrie Kost Update since Hepix Spring 2005
2
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 $2995 US w 1 yr support indexes up to 100,000 docs 220 different file formats Two 10/100 Ethernet ports - 1 st for normal operation - 2 nd for setup using cross-over cable 120GB Seagate Drive 2GB Memory Maintainance via special google dial- up modem Google Mini comes to TRIUMF Read a complete in-depth review at http://www.anandtech.com/IT/showdoc.aspx?i=2523&p=2
3
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005
5
The TRIUMF-CERN 1GbE Lightpath(s) TRIUMF BCNET CANARIE SURFnet CERN 1 GbE circuit establishedApril 18 th 2005 2 nd GbE circuit established July 19 th 2005
6
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 http://grid.triumf.ca/status/sc3.html Servers 3 EMT64 systems, each with: 2 GB memory hardware raid - 3ware 9xxx SATA raid controller Seagate Barracuda 7200.8 drives in hardware raid 5 - 8 x 250 GB 1 dual Opteron 246 server with: 2 GB memory 3ware 9xxx SATA raid controller WD Caviar SE drives in hardware raid 0 - 2 x 250 GB 2 4560-SLX IBM Tape Libraries (currently each with only 1 SDLT 320 tape drive) 1 borrowed EMT64 system used temporarily as an FTS Server with: 1 GB memory 2 SATA 80 GB drives for the OS and for Oracle's needs. Storage 5.5+ TB disk 8+ TB tape ATLAS Service Challenge
7
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 ATLAS Service Challenge
8
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 10 GbE Lightpath to CERN TRIUMF CERN Atlantic Crossing √ √ √ √ √ √ X
9
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 10 GbE Lightpath to CERN Permanent 10GbE TRIUMF-CERN Lightpath ~ year-end 2005 Foundry Bigiron RX-4’s at TRIUMF & BCnet
10
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 10 GbE Lightpath to CERN
11
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF WAN CWDM BCNET 22km 10GbE Foundry Switch (CERN / Ottawa) MRV CWDM 1610 nm 1590 nm 1570 nm 1550 nm Potential to Add 2 more 1GbE channels Single Pair Fiber 4 1GbE channels Passport 8600 ORAN WESTGRID 2x CERN SFP 4 Port Optical Mux 2x GbE TDM PROBLEM: MRV needs 1550+/-3nm but FOUNDRY 1550+/-15nm
12
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 Raid5: Puzzling I/O results Repeated reads on same set of files (at 600MB/sec) – one or more files will “degrade” – typically after set of 16 8GB files have been read 1000 times. Positive: Read ~2PB during 50 days – averaging about 600MB/sec 8 SATA disks on each of pair of RAID5 RocketRaid 1820A controllers
13
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 Unix Backups at TRIUMF Amanda system –Dual Opteron 248 2.2 GHz 2G Memory 16 x400G WD disks ~ 6TB (1.5TB present sys ~ 10day cycle) 2 LSI Mega raid 8 disk controllers Disk based ~1 month of backups –At least 2 full backups with daily incrementals 26 Slot Overland DLT tape library SDLT 600 drive 300G native capacity per tape 150 Linux machines (users: home dir, servers: full)
14
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 Cheap Hot-Swap Backup Promise SuperSwap 1100 Enclosures Four 400 GB Seagate Sata Drives Promise FastTrak S150 SX4 Sata controller Raid 5 Linux 2.4.20-8 RedHat 9 A disk can be removed at anytime and replaced at anytime. Rebuilds in background. Used to keep live multiple (daily) RSYNC (via DIRVISH) copies of critical servers (for ~ 1 month). See http://www.dirvish.com/
15
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 VOIP coming to TRIUMF
16
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF Ticketing System (Request Tracker)
17
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF Ticketing System (Request Tracker)
18
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 http://hepix.caspur.it/afs/hepix.org/projects.html
19
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 - Site services (Web, Email, Batch, Windows) all much more stable – new hardware, more memory (typically 4-8GB) in servers - Quad Opteron SUN I/O - using external SATA - still limited below 1 GB/sec - Read 16 8GB files repeatedly – averaging over 600MB/sec for ~2PB - Site “Backup” services still problematic - tape media capacity (outgrow in 2 years) - reliability (is SDLT robust?) - Permanent 10GbE TRIUMF-CERN service by year-end. - ATLAS Service Challenges targets being met for TRIUMF as TIER1 - Started using PLONE as content management for TRIUMF Web Server - Moving some phones to voice-over-IP - Scientific Linux (3 &4) still preferred Linux OS at TRIUMF - Moving away from distributed printing to print/scan-to-email/copy stations Conclusions / Observations
20
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 STORM1 STORM2 SUN1 Foundry LCG STORAGE WORKER NODES GPS TIME MSR WEB NAME DOCUMENTS CONDORG WEB SHARE MAIL FILE IBM CLUSTER FEDORA / SL MIRROR IBM / SHARE STORAGE AMANDA BACKUP (VIA DISKS) TRIUMF Servers – May/2005
21
TRIUMF Site Report for HEPiX, SLAC, October 10-14,2005 TRIUMF Servers – October/2005
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.