Presentation is loading. Please wait.

Presentation is loading. Please wait.

PETE 411 Well Drilling Lesson 29 Cementing.

Similar presentations


Presentation on theme: "PETE 411 Well Drilling Lesson 29 Cementing."— Presentation transcript:

1 PETE 411 Well Drilling Lesson 29 Cementing

2 Cementing Cementing Processes Density of Mixtures Cementing Equipment
Casing Liner Squeeze Plug Density of Mixtures Cementing Equipment

3 Read: Applied Drilling Engineering, Ch. 3
HW # Well Control – W&W due

4 Cement is used in Drilling Operations to...
Support and protect the casing Prevent the movement of fluid through the annular space outside the casing Stop the movement of fluid into vugular or fractured formations Close an abandoned well or a portion of a well Sidetracking

5 Types of Cementing Processes
I. Primary Cementing 1. Full String 2. Liners 3. Large Pipe (lesson 31) 4. Stage (lesson 31) A. Survey and perforate B. Stage collars

6 Primary Cementing Full String Cementing Liner Cementing Steel Casing
Borehole Cement Steel Liner Full String Cementing Liner Cementing

7 Types of Cementing Processes
II. Squeeze Cementing 1. Shoe 2. Casing (up-hole) 3. Open-hole (lost-circulation)

8 NEW SLURRY

9 Types of Cementing Processes
III. Plugging 1. Open-hole plug back A. Fishing Operations B. Abandonment 2. Casing

10

11 Types of Cementing Processes
IV. Special Techniques 1. Land 2. Off-shore

12 Mixing Cement (basis is 1 sk. of cmt.)
The density-volume formula: Slurry Yield (volume of mixture/sk):

13 Rotary Drilling Cementing (basis is 1 sk of cmt.)
Density of Each Component in Slurry: e.g. Density of Barite = Specific Gravity of Barite * Density of Water

14 Rotary Drilling Cementing (basis is 1 sk. of cmt.)
Density of Cement Slurry:

15

16

17

18 Wiper Plugs Wiper plugs are equipped with rubber-cupped fins which wipe mud from the walls of the casing ahead of the cement and clean the walls of casing behind the slurry. Examples of wiper plugs are shown in the next slide. The top plug also serves as a means of determining when the cement is in place.

19

20 Mud film thickness Feet of fill per 1000’
5 1/2” 7” 1/16” 1.6mm 1/32” 0.8mm 1/64” 0.4mm

21

22

23

24

25

26 Cementing After Cementing (check)

27


Download ppt "PETE 411 Well Drilling Lesson 29 Cementing."

Similar presentations


Ads by Google