Presentation is loading. Please wait.

Presentation is loading. Please wait.

Activation of SSAS XYZ Port Facility Maritime Security Drill Briefing for Players date.

Similar presentations


Presentation on theme: "Activation of SSAS XYZ Port Facility Maritime Security Drill Briefing for Players date."— Presentation transcript:

1 Activation of SSAS XYZ Port Facility Maritime Security Drill Briefing for Players date

2 Activation of SSAS Emergency Response – Security measures compromised Activation of SSAS Drill D413

3 Activation of SSAS Scope Review of the previous drill Date, time, location Aim Objectives Desired outcomes Controllers Players Scenario Port Facility security instructions Communications Safety Debrief Update on the ISPS Code/local regulations Developments in maritime security

4 Activation of SSAS Review of Previous Port Facility Drill no. X/XX Date conducted: Objectives: Lessons Learnt:

5 Activation of SSAS Drill number: X/XX Date: Start Time: Location: Estimated End Time:

6 Activation of SSAS Aim To enhance the proficiency of port facility security staff in responding to an activation of the Ship Security Alert System (SSAS) onboard a ship in the port facility

7 Activation of SSAS Objectives Respond to an activation of the SSAS onboard a ship in the port facility according to procedure in the PFSP.

8 Activation of SSAS Desired outcomes Security staff will be able to: Recognize the various means by which an activation of the SSAS from a ship alongside may be communicated to the Port Facility. Communicate with and render assistance to ship as required.

9 Activation of SSAS Control Team Chief Controller: Safety Manager, Mr. AAA

10 Activation of SSAS Players Security staff

11 Activation of SSAS Scenario The SSAS on a ship alongside the port facility has been activated. The Flag State has, through the Port State, requested the port facility to verify the alert and to provide the necessary assistance.

12 Activation of SSAS Port Facility Security Instructions

13 Activation of SSAS Communications Telephone Walkie-Talkie  Player – Ch YY

14 Activation of SSAS Drill StartThe drill is to commence Drill SuspendThe drill is temporarily suspended Drill GoThe drill is to resume from where it was suspended Drill StopThe drill is to be terminated (prematurely) Drill EndThe drill is completed Drill, Drill, DrillThe message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity Code words

15 Activation of SSAS Safety Physical safety of personnel is paramount There is to be no physical contact between player and controllers acting as intruders, etc. Security staff are not to use abusive language when talking to controllers acting as “intruders” Do not neglect the safety of equipment

16 Activation of SSAS Debrief Location: Secretary: Attendance 

17 Activation of SSAS Updates on the ISPS Code and local Regulations

18 Activation of SSAS Developments in Maritime Security

19 Activation of SSAS Any questions ?


Download ppt "Activation of SSAS XYZ Port Facility Maritime Security Drill Briefing for Players date."

Similar presentations


Ads by Google