Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013.

Similar presentations


Presentation on theme: "Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013."— Presentation transcript:

1 Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013

2 PRESENTATION OUTLINE 1.An overall description of dredging projects 2.The analysis of specific dredging project management issues 3.Project management problems encountered during analysis 4.Proposed solutions to the problems 5.Development of WPMA 6.A scenario for future project implementation 7.Conclusion 8.Questions

3 1.OVERALL DESCRIPTION OF DREDGING PROJECTS Channels, civil, and Maritime Infrastructure Past and Present Herbich (2000) and World Dredging (March 2005)

4 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Navigational Channels

5 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Land Protection, Beach Nourishment (Terra et Aqua, June 2006)

6 1. OVERALL DESCRIPTION OF DREDGING PROJECTS New Ports (Terra et Aqua, September 2006)

7 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Civil Engineering Projects

8 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Cutter Head Dredge (IHC, October 2005)

9 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Hooper Dredge (DPC, October 2006)

10 1. OVERALL DESCRIPTION OF DREDGING PROJECTS Mechanical Dredges (GLDD, October 2005)

11 2. THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES To perform this analysis, I examined general dredging project management functions and processes.

12 2. THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES

13 2. THE ANALYSIS OF SPECIFIC DREDGING PROJECT MANAGEMENT ISSUES

14

15 3. PROJECT MANAGEMENT PROBLEMS The major management problems encountered were: The lack of information-sharing between owner and potential contractors during the preconstruction phase. The lack of information flow to owners during the construction phase of the project.

16 4. PROPOSED SOLUTIONS 1.Pre-qualifying potential contractors in the early stages of the project’s preconstruction phase. 2.Bringing an independent management team with expertise in dredging into the project in its early stages. 3.Developing a comprehensive information and communication management plan, risk management plan. 4.Using information and communication technologies to implement the three points described above.

17 5. DEVELOPMENT OF THE WPMA SYSTEM The processes followed during the development of the WPMA were: 1.Planning and Analysis of the WPMA 2.Design and Implementation of the WPMA PlanningDesign

18 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA 1.Objective 2.System Requirements 3.System Development Plan PlanningDesign

19 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Objective: PlanningDesign

20 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Requirement Specifications: R1. The WPMA shall be a web-based application running on a server that has access to the Internet. R2. The WPMA shall be accessed through a web browser for data and documentation input and for data, information, and documentation output. R3. The WPMA shall implement data input, data output, reporting capabilities, and data management capabilities in accordance with the following roles: Owner, Contractor, Owner’s Team, and Contractor’s team. PlanningDesign

21 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA Requirement Specifications: R4. The WPMA shall have the capability to authenticate the users in accordance with their corresponding roles for data and information management. This will enable the logging and certification of users at any geographic location that have an Internet connection. R5. The WPMA shall store the information entering the system on a database for future processing. R6. The WPMA shall have automatic data processing capability. The data entering the system will be automatically processed for reporting capabilities. PlanningDesign

22 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan: 1.WPMA Development Methodology Definition 2.WPMA Architecture Definition PlanningDesign

23 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Development Methodology Definition: PlanningDesign

24 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition: During the WPMA System Architecture Definition, several system alternatives were explored: 1.Stand-alone client application running on a client computer and a database (i.e. Access). 2.Client application with a central server and a database server. 3.Web-based application with a managed server and a database server. PlanningDesign

25 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition: PlanningDesign

26 5. DEVELOPMENT OF THE WPMA SYSTEM 5.1 Planning and Analysis of the WPMA The Development Plan - WPMA Architecture Definition: The WPMA has been implemented using the following tools: 1.Visual Studio 2005 development environment. 2.ASP.NET 2.0 framework. 3.C# programming language. 4.SQL Server 2005 database. 5.MS Reporting Services 2005 for report services. 6.MS SharePoint 2007 for collaborative environments. 7.MS Small Business Server 2007 8.Internet Information Services 6.0 PlanningDesign

27 5. DEVELOPMENT OF THE WPMA SYSTEM 5.2 Design and Implementation of the WPMA Data Input and Output Data Storing Data Processing Reporting the Information PlanningDesign

28 PlanningDesign

29 MD Basics PlanningDesign

30 Transporting Loaded Barges to Unloading Site PlanningDesign

31 Unloader Boom and Snorkel Pump PlanningDesign

32 Unloading Operation PlanningDesign

33 Placement Site PlanningDesign

34 5. DEVELOPMENT OF THE WPMA SYSTEM

35 PlanningDesign

36 PlanningDesign

37 PlanningDesign

38

39

40 PlanningDesign

41 PlanningDesign

42 PlanningDesign

43 PlanningDesign

44 6. A SCENARIO FOR FUTURE PROJECT IMPLEMENTATION WPMA Development Panama Canal Educating the Industry WPMA Commercialization

45 Conclusions The WPMA Concept The WPMA Functions The Development Methodology The future of the WPMA

46 Questions ?


Download ppt "Web-based Technology Web-based Project Management Application (WPMA) for Dredging Projects By GUSTAVO VECINO Civil Engineer February 2013."

Similar presentations


Ads by Google