Lesson 8 Offshore Drilling
PETE 406 Lesson 8 Offshore Drilling
2
Content Inland barges (submersible) Jackup rigs Platform rigs
Wildcats Shallow water templates Cantilevered over platform Platform rigs Floaters - semi’s and drillships
3
Inland barge Used in swamps, bays, inland water, shallow offshore.
Floated and towed to location On location these rigs are submerged Well is drilled Personnel and supplies are brought in by boat.
4
Noble Drilling’s Cecil Forbes A Jack-Up Rig
Jackup rigs Noble Drilling’s Cecil Forbes A Jack-Up Rig
5
Jackup rigs Independent legs or mat supported
Some are self propelled to location, but most moved by tugs On location survey boat surveys location
6
Jackup rigs Legs jacked down to sea floor Hull picked up above water
Rig “pre-loaded” Seawater pumped out Jacked up to working “air gap” Well drilled
7
Jackup rigs Used for both wildcat and development
Shallow water up to ’ WD Derrick may be fixed or cantilevered
8
Platform rigs Tendered
9
Platform Rig Self contained
10
Platform Rig Operations similar to land except: Limited storage space
Crew lives on location Cementing operations simpler
11
Floating rigs Semi-submersible Drill ships
12
Sonat’s George Washington A Semi-Submersible Rig
13
Zapata’s Trader A Drillship
14
Semi-submersible Marine Riser Subsea BOP stack
15
Drilling from Floating Vessel
Rig move Hole opener pulled from storage and prepared for use Structural casing is measured and brought on deck Inspect and test riser and BOP system
16
Drilling from Floating Vessel
Water depth at new location verified Tide tables obtained Choke manifold inspected and tested Site surveyed and marked with buoys
17
Drilling from Floating Vessel
Anchor boats on location Heading adjusted and anchor setting begins
18
Drilling from Floating Vessel
19
Drilling from Floating Vessel
Anchor lines tensioned
20
Drilling from Floating Vessel
Well prepared for spudding Temporary guide base (A) set 36” Structural hole drilled to 80’ to 200’ BML 30” Structural casing (B) run and cemented with permanent guide base (C) attached C B A
21
k 26” Conductor hole drilled to approx. 1000’ BML
Can be drilled with or without riser 20” conductor casing run and cemented. k
22
lling Wellhead installed with conductor casing
23
While WOC riser and stack are N/U and latched onto the wellhead
Control pods
24
Surface hole drilled to 3000’ to 5000’ BML
Surface casing is run and cemented through riser and BOP’s
25
Floating Drilling Float collar drilled out and casing tested
Float shoe drilled out and 5’ to 15 feet of new formation drilled Hole is circulated and conditioned Casing seat is tested
26
Intermediate hole drilled to just above target zone and logged
Intermediate casing set, cemented and tested Intermediate casing drilled out Hole circulated and conditioned Casing seat tested
27
Production hole drilled to TD and logged
Production casing or liner run and cemented Well completed and tested
28
Floating Drilling After testing, hole prepared for abandonment
P&A, PNA TA, T&A, TNA Perfs squeezed, and cement plugs set according to regulatore rules and regulations
29
Floating Drilling Riser and BOP retreived
Casing cut approx. 10’ BML if PNA Temporary and permanent guide base retrieved Anchors pulled Vessel under way to next location