Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar Ruth Shinar with Bob Mayer.

Similar presentations


Presentation on theme: "Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar Ruth Shinar with Bob Mayer."— Presentation transcript:

1 Sd-May11-20 Betty Nguyen Scott Mertz David Hansen Ashley Polkinghorn Advisors Joseph Shinar Ruth Shinar with Bob Mayer

2 Background  Existing Solution Network communication confirmed, prototype No confirmed DO content measurement Bulky Code ○ No Calibration Messages Power consumption ~180mA at all times Non-functional boards ○ Faulty boards that would burn out

3 Project Objective  Implement robust low-power, star topology network of DO sensors  Increase accuracy of DO measurements by factoring in temperature  Implement remote calibration of DO sensors  Reduce power consumption of units to increase battery life of remote sensors  Redesign and refactor existing implementation to increase maintainability and flexibility

4 Functional Requirements  The monitor units shall take readings of dissolved oxygen and of temperature and use them to calculate DO levels.  The monitor units shall wirelessly transmit their readings to the master controller.  The master controller shall request readings from each monitor unit.  The master controller’s graphical user interface shall display information from each monitor unit to the user and allow an operator to obtain data from a specific unit.  The master controller user interface shall allow the user to poll a monitor unit for data.  The Windows service shall log all data processed through the unit in a SQL database.  The network nodes shall create a star-like topology.  The Windows service shall send calibration data to each monitor unit.  The monitor units shall enter a low-power sleep mode when not in use.

5 Nonfunctional Requirements  The monitor units’ calibration data shall persist across power loss.  The DO monitors and the network coordinator must communicate when they are up to 1000 meters apart.  The system should be able to configure in a star topology.  The temperature measurements shall be accurate to ±1 degree Celsius.  The DO measurements shall be accurate to ±0.5 ppm.  The monitor units’ batteries shall last 14 days.

6 System Decomposition

7 DO Sensor Hardware

8 DO Sensor Theory of Operation  Platinum/Palladium Octaethylporphyrin (Pt/PdOEP) films excited by UV or green OLEDs.  Measure DO by observing the decay constant (tau) of the photoluminescence (PL) of the excited PtOEP films

9 DO Sensor Theory of Operation 1. Excite the PtOEP film 2. Sample PL over time using a photodiode and microprocessor to measure the voltage from the sensor 3. Calculate tau using least-squares exponential fit 1. 0% DO - ~100µs 2. 20% DO (air) - ~30µs 3. 100% - <5µs 4. Calculate DO with temperature (and film) dependent a and b

10 DO Monitor Software

11 ZigBee Node

12 ZigBee Network Coordinator

13 Master Controller Improvements  Modular Message Types  Fewer Database Queries  Separation of Concerns  Calibration Capability  Database Relationships

14 Master Controller Service

15 Master Controller GUI

16 Master Controller Database

17 DO Sensor Testing  Couldn’t compare DO measurement directly due to old, degradated PtOEP films  Instead, measure tau and compared to lab measurement  100% PL decay too fast to measure with MCU  Temperature measurements within ±1°C DO Lab (us) Ours (us) 0%73.874.9 20%35.737 100 %14.713-16

18 DO Monitor Unit Power Usage Estimated battery life w/out changes (remote, 5 minute period): 2.4 days Estimated battery life w/ changes (remote, 5 minute period): 20.2 days Estimated battery life w/ changes (remote, 15 minute period): 23.7 days

19 ZigBee Network Testing  Verified ZigBee Node can register with the Master Controller  Verified ZigBee Node can sleep and wake up  Verified ZigBee Node checks in periodically  Verified ZigBee Node can wake up the DO Monitor to get DO Data and for calibration  Verified the Network Coordinator can receive/send messages and interact with the Master Controller

20 Master Controller Testing  Verified that message are scheduled correctly  Verified that the correct data is displayed  Verified that the correct data is exported  Verified MC Service’s response to node check-ins  Verified that readings from nodes are received and stored properly

21 System Testing  Accurate DO and temperature readings transmitted to the Master Controller and logged  Calibration data transmitted to the DO monitor unit  Monitors use as little power as possible  Calibration and readings are scheduled and executed on remote devices  Readings are retrieved for export and display in the GUI  Network functioned correctly with simulated high traffic (Increased check-in rate on network of 3 nodes)

22 What is Next for the Project  Integrate Pressure Sensor  Handshaking protocol for PC software and Network Coordinator  Switch from Zigbit Amp to Digimesh to allow for true mesh network with power saving  Reduce current usage to ~5mA in sleep mode  Create Network Coordinator PCB  Accurate readings at high DO levels

23 Conclusions  Integrated temperature sensor  Brought current consumption down to ~40mA by using a sleep mode procedure  Actually measured DO content accurately  Upgraded and refined hardware  Created a working star network  Added calibration utility  Documented new and existing code

24 Questions?