Download presentation
Presentation is loading. Please wait.
Published byLinette Dennis Modified over 9 years ago
1
Colorado Helps Advanced Manufacturing Program (CHAMP) Grant Dr. Devi Kalla
2
CHAMP Information MSU Denver CHAMP Award: $1,958,663 Timeline – October 2013-September 2017 ▫Year One Personnel, Certificate Development, Open Educational Resources (OERs), Equipment, Trainings ▫Year Two Equipment (final), CHAMP-IAB, finish OERs, Certificate implementation, Articulation agreements ▫Year Three Full course, certificate & articulation implementation ▫Year Four Data Collection/Analysis
3
CHAMP Goals Build off Colorado’s existing and emerging manufacturing sector partnerships and career pathway work to develop employer-driven curriculum throughout the grant period; Use technology to accelerate training and reach a broad audience; Redesign the current Colorado Community College System model for credit for prior learning (CPL) to accelerate certification; Develop stackable and latticed certificates with institutional agreements between the participating community colleges and Metropolitan State University of Denver (MSU Denver).
4
MSU Denver’s Role Two Departmental Certificates Transfer and Articulation from CHAMP Consortium Community Colleges to MSU Denver Provide guidance to CCCS regarding CPL Purchase of new equipment
5
Transfer and Articulation Streamlined transfer and articulation to MSU Denver MSU Denver is committed to working with each participating community college to crosswalk their manufacturing programs so students can easily understand which course will transfer toward a bachelor’s degree at MSU Denver Stackable and latticed certificates
6
Credit for Prior Learning (CPL) Prior learning is college equivalent education acquired through: ▫Non-traditional schooling ▫Work ▫Other life experiences MSU Denver, along with the Council for Adult Education and Learning (CAEL) is assisting in building CCCS’s capacity to assess and award college-level CPL MSU Denver and CCCS will establish common CPL- specific transfer and articulation agreements
7
CHAMP Equipment CNC Sinker Electro-Discharge Machine (EDM) Compression Molding Machine (CMM) EPOCH XT: The Complete Ultrasonic Flaw Detector Vacuum Assisted Resin Transfer Molding (VARTM) 3D Printer ▫capable of printing metal and ceramic Assembly Line ▫Flexible Manufacturing System (FMS) ▫Capable of expansion if desired in the future
8
CHAMP Consortium Front Range Community College (FRCC) – LEAD MSU Denver – 4 year University Partner Aims Community College (AIMS) Community College of Denver (CCD) Emily Griffith Technical College (EGTC) Lamar Community College (LCC) Pikes Peak Community College (PPCC) Pueblo Community College (PCC) Red Rocks Community College/Warren Technical College (RRCC)
9
Partnerships CHAMP Consortium Contacts/Partners MSU Denver CHAMP Contacts/Partners Accu-Precision Tool and Gauge, LLC. Alfred Manufacturing Barber-Nichols, Inc. Coors EVRAZ GeoTech Environmental Equipment Inc. Ingram Machining, Inc. Intrex Aerospace JPM Prototype & Mfg. Co. Manes Machine and Engineering Company Mountainside Medical Colorado, LLC Quantum Stacy Machine and Tooling, Inc. St. Vrain Manufacturing Techniques Swiss, LLC Trane Whip Mix Corporation Woodward Aerotek Airgas Arrow Sheet Metal B & B Machine and Grinding Service Cart Works Company E & C Precast Concrete, Inc. Image West Design Mainstreet Pedicab Perkins Energy Law Polystrand Protogenics RMH Group The 3D Printing Store United Launch Alliance
10
Opportunities for Collaboration CHAMP- Industry Advising Board Industry Tours Student/prospective student outreach ▫Veteran Outreach Career Pathway ▫Resume review ▫Interview workshops ▫Internships
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.