Volkswagen Group Rus - TechnoparkStand: May 2009 Volkswagen Suppliers in Kaluga – Contribution to Regional Development VI Kaluga Invest-Forum May 14 th.

Similar presentations


Presentation on theme: "Volkswagen Group Rus - TechnoparkStand: May 2009 Volkswagen Suppliers in Kaluga – Contribution to Regional Development VI Kaluga Invest-Forum May 14 th."— Presentation transcript:

1 Volkswagen Group Rus - TechnoparkStand: May 2009 Volkswagen Suppliers in Kaluga – Contribution to Regional Development VI Kaluga Invest-Forum May 14 th 2009

2 2Volkswagen Group Rus - TechnoparkStand: May 2009 Capacity ca. 150.000 Fahrzeuge/a (cars/year) ca. 3.000 Mitarbeiter (employees) Investment > 500 Mio Euro plus > 95 Mio Euro outsourced press shop 4 1 2 5 3 1 Fahrzeugwerk / car plant 2 Importeurslager / import storage 3 Ersatzteillager / spare part storage 4 Industriepark / Technopark 5 Option OOO Volkswagen Group Rus Kaluga

3 3Volkswagen Group Rus - TechnoparkStand: May 2009 Investment agreement with «Volkswagen AG» signed: 29. May 2006 Laying the foundation stone: 28. October 2006 First assembly: 28.November 2007 Car assemblies in 2008: > 60 000 cars Car models to be manufactured in Kaluga: - Skoda Oktavia - VW Tiguan - Skoda Fabia - VW Polo - VW Passat - Current stage of realization: construction of production workshop in progress SOP full-fledged production: September 2010 Data

4 4Volkswagen Group Rus - TechnoparkStand: May 2009 Supplier Area Tec h nopark Volkswagen Group Rus to Moscow to Kaluga/Tula

5 5Volkswagen Group Rus - TechnoparkStand: May 2009 Technopark - Supplier Area “4” Total area: ca. 110 ha net

6 6Volkswagen Group Rus - TechnoparkStand: May 2009 Land plot supplier area “4”: Location: Technopark «Grabtsevo» Total area: 110 ha 1-st stage of development: 40 ha Category of land: industrial land Owner, sales & development: OJSC «Kaluga Region Development Corporation» (KRDC) Minimal lot size: 2 ha Media: electricity*, gas, water, telecommunication, sewage water, rain water are included in the sales price * Electricity 0.5 megawatt per hectare included in sales price

7 7Volkswagen Group Rus - TechnoparkStand: May 2009 Seat frames Kaluga Exhaust Kaluga Wheels Kaluga Car glass Kaluga Fuel tank Kaluga Interior trim Kaluga Acoustic trim Kaluga Seating Kaluga Ceiling St. Petersburg Axles Kaluga Front end Kaluga Body parts Kaluga Lighting Ryazan Washer tank Kinel Instruments Chistopol Horn --- Absorbers St. Petersburg Pedals Ryazan Tires Jaroslavl Sealing Tutaev Seat foams Moscow Headlining --- Cable Cover Togliatti Cockpit Tula Tires Nizhnekamsk Filter St. Petersburg OOO Volkswagen Group Rus – Component Localization Russia

8 8Volkswagen Group Rus - TechnoparkStand: May 2009 Seat frames Kaluga Exhaust Kaluga Wheels Kaluga Car glass Kaluga Fuel tank Kaluga Interior trim Kaluga Acoustic trim Kaluga Seats Kaluga Axles Kaluga Front end Kaluga Body parts Kaluga OOO Volkswagen Group Rus – Component Localization Kaluga

9 9Volkswagen Group Rus - TechnoparkStand: May 2009 Development Supplier Requirements for Construction Area

10 10Volkswagen Group Rus - TechnoparkStand: May 2009 Magna 7 ha Media Center offen A+Park 20 ha

11 11Volkswagen Group Rus - TechnoparkStand: May 2009 General procedure for investors in Technopark «Grabtsevo»: Submission of «Production Placement Application» (download from www.invest.kaluga.ru) to Kaluga Region Development Corporation KRDC www.invest.kaluga.ru Project approval by Volkswagen Group Rus (required!) Investment agreement with Kaluga Region Government and KRDC Preliminary agreement with KRDC e.g. for land survey (optional!) Land purchase contract with KRDC Construction

12 12Volkswagen Group Rus - TechnoparkStand: May 2009 We expect from our JIT, key & volume suppliers to settle next door benefits e.g.: transport, reaction times, direct communication, chance of simplified logistics etc. Neighborhood creates synergies (Volkswagen & Supplier and Supplier & Supplier): e.g. construction (speed through use of existing men & material), security, general services, transport etc. Strong commitment from Kaluga towards Technopark Grabtsevo Dense tier 1 supplier community attracts tier 2 & 3 suppliers Strengthened position discussing general infrastructure etc. Technopark Grabtsevo - Benefits

13 13Volkswagen Group Rus - TechnoparkStand: May 2009 Our Message If our suppliers decide for a green field solution within Kaluga Oblast Technopark Grabtsevo must be first choice Volkswagen Group Rus as well as Kaluga Government and Administration are actively supporting this policy

14 14Volkswagen Group Rus - TechnoparkStand: May 2009 KRDC «Kaluga Region Development Corporation» Mr. Dmitriy Abramov Head of Investment Programs Department Tel/Fax: +7 4842 79 04 10 E-mail: abramov.krdc@gmail.comabramov.krdc@gmail.com Mr. Igor Egerev Head of Project Management Department Tel/Fax: +7 4842 79 04 10 E-mail: egerev.krdc@gmail.comegerev.krdc@gmail.com OOO «Volkswagen Group Rus» Dr. Harald Manzenrieder Supplier Placement Techno park Tel: +7 4842 718 086 Fax: +7 4842 718 085 E-mail: harald.manzenrieder@volkswagen-rus.ruharald.manzenrieder@volkswagen-rus.ru Miroslav Vlasak Purchasing Director Tel: +7 4842 718 074 Fax: +7 4842 718 060 E-mail: miroslav.vlask@volkswagen-rus.rumiroslav.vlask@volkswagen-rus.ru

15 15Volkswagen Group Rus - TechnoparkStand: May 2009 Thank you for your attention