1. “Analysis of Supply & Demand” Moderator: Harvey Bernstein, Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw-Hill Construction.

Similar presentations


Presentation on theme: "1. “Analysis of Supply & Demand” Moderator: Harvey Bernstein, Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw-Hill Construction."— Presentation transcript:

1 1

2 “Analysis of Supply & Demand” Moderator: Harvey Bernstein, Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw-Hill Construction Panelists: Robert M. Gasperow, Executive Director, CLRC Construction Labor George Gritziotis, Executive Director, Construction Sector Council, Canada

3 Panel Discussion: Analysis of Workforce Supply & Demand Harvey Bernstein, F.ASCE Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw- Hill Construction

4 4 Why Do We Need Labor Forecasts? big picture understanding  Helps with big picture understanding of trends and worker migration changes over time  Provides insight into changes over time of workforce springboard  Provides a springboard to answer some questions about the distribution of trades by building type and geography

5 5 Challenges to Creating Demand & Supply Forecasts   Understanding exactly how much labor, by trade, flows into different kinds of construction types   Differences in construction practices by geography   Understanding the supply of labor by trade & across geographic areas

6 6 Examples of Existing Major Information Sources   Department of Commerce’s Economic Census of Construction Industries   Bureau of Labor of Statistics Occupational Employment Surveys   McGraw-Hill Construction Dodge Construction Project Data   SEMTA’s * Southeastern U.S. Open Shop Craft Census Study   Construction Labor Research Council’s Database of Labor Costs * Southeast Manpower Tripartite Alliance (SEMTA) has been organized to determine the magnitude of craft labor demand and supply in the Southeast, including the impact of Hurricanes Katrina and Rita; identify ways to minimize potential labor shortages; and develop appropriate action plans

7 7 Specific Outcomes of Demand & Supply Forecasts  Projection of overall demand  Projection of overall demand and supply for each of the skilled trades during the intermediate (up to 5 years) and long-term (more than 5 years)  Geographic concentration  Geographic concentration for each skilled trade  changes in construction practices  Determination of the impact that changes in construction practices, building products and worksite management / training may have on skilled trade

8 8  relationship between different craft hours for different project types  Understanding the relationship between different craft hours for different project types  Construction activity trends  Construction activity trends, nationally, regionally and by state  industry project forecasting  Construction industry project forecasting methodology and expertise   Number of people with occupational skill sets   Mobility of labor force Elements Needed in Labor Demand & Supply Forecasts

9 9  Construction Sector Council (Canada) Construction Labour Market Information (LMI) Program – –Workforce supply demand forecasting – –Canadian national, provincial, metro  Construction Labor Research Council – –Analysis of labor supply through 2015 and specific studies – –Quantify needs in the Southeast and Midwest  McGraw-Hill Construction Labor Demand Forecast Current Demand & Supply Forecast Models

10 10

11 Data’s Role in Assuring Adequate Supply Robert M. Gasperow, Executive Director, CLRC Construction Labor

12 12 To Be Covered Volume Demographics Wages Government

13 13 Volume Mix Change SEMTA BCTD Other

14 14

15 15 SEMTA Data Entry http://www.surveystoday.com/sedemand.html

16 16 Demographics Aging New Entrants Composition

17 17 Labor Force Growth Rate TotalMale 16-24 90 – 001.3%-0.1% 00 – 100.9-0.2 10 – 200.6-1.0 20 – 300.4 1.0

18 18 Wages Relationship to Supply Relationship to Demand

19 19 Track Record Past Success Evaluating Entrants

20 20 Government BLS Projections Apprenticeship Voc Ed

21 21 State Projections http://www.projectionscentral.com

22 22

23 McGraw-Hill Construction’s Construction Labor Demand Forecast Harvey Bernstein, F.ASCE Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw- Hill Construction

24 24 MHC Construction Labor Demand Forecast   Focuses on creating a demand model for skilled trades in the construction sector –intermediate term –Over the intermediate term (5 years) –local skilled trade utilization mix –Calculates local skilled trade utilization mix   Covers U.S. at national, state and local levels –geographic and building type detail extends down to the local geography –The geographic and building type detail in MHC forecasts means projections of demand for the skilled construction trades by building type extends down to the local geography   Links building activity with labor demand in ways that are consistent with federal data and McGraw-Hill Construction forecasts and Dodge project data

25 25 MHC Construction Labor Demand Forecast Methodology Dodge database of construction starts  Uses proprietary Dodge database of construction starts along with projects in the planning stages MHC forecasting models  Uses MHC forecasting models to determine sector forecasts and scale to regional and state level forecasts U.S. government data  Uses U.S. government data to determine skilled trade hours in different building types national, state demand coefficients  Creation of national, state demand coefficients for state and local forecasts

26 26 MHC Proprietary Project Information  Dodge Project Network Database: –The most comprehensive source for construction starts data for the entire U.S. –Used by U.S. Department of Census for Put-in-Place, which feeds GDP calculation –Time series data monthly back to 1967 –600,000 active projects –60,000 plans and specifications per year

27 27 MHC Proprietary Forecasting Methodology  Analytic Analysis: –Forecasting models –Forecasting models based on the most comprehensive historical database available –Econometric models –Econometric models for 22 major construction industry sectors at the national and regional levels –State and metro area models percentage of projects that will ultimately reach start (within 5 years) –Expertise in determining the percentage of projects that will ultimately reach start (within 5 years) length of time to start for projects –Expertise in determining the length of time to start for projects construction analysis, forecasts and trends

28 28 Uses Government Data to Create National Demand Coefficients  Create national “demand coefficients” by drawing on two major government information sources to create a table of skilled trade employment per thousand dollars of construction value by building type –Department of Commerce’s Economic Census of Construction Industries: –Department of Commerce’s Economic Census of Construction Industries: Contributions of each construction industry to building activity by building type –Bureau of Labor of Statistics Occupational Employment Surveys (OES): –Bureau of Labor of Statistics Occupational Employment Surveys (OES): Occupational employment for the skilled trades by industry

29 29 Creating State & Local Demand Coefficients  Adjust national demand coefficients to fit state and major metro areas  Use OES data & MHC Dodge project data  MHC data allows for impact from large projects  These calculations are performed to produce trade hours per $1000 of construction by building type

30 30 Creating Local and State Skilled Trade Forecasts  Multiply the demand coefficients by the corresponding McGraw-Hill Construction forecast by building type for a state or local level  Sum each skilled trade across building types  Note: The construction mix is crucial in forecasting demand for the trades, since utilization rates vary significantly by building type

31 31 Labor Demand Forecast Deliverables five years  Forecast out labor hours for five years –By building type –By geography  National, state and local levels by project type  Information by project type by skilled trade  Information by skilled trade large project impact  Information on large project impact on labor demand

32 32 Electricians in Albany-Schenectady-Troy, NY  Anticipated spike of labor demand in office construction sector in 2007  Driven by several large office projects in the planning stages ActualForecast

33 33 Electricians in Albany-Schenectady-Troy, NY  MHC examines large projects in the planning queue  And evaluates whether projects will go to start  This allows for clarity on labor demand forecasts  More large projects means the forecast will be more stable versus dependence on one very large project

34 34 For More Information: Contacts:  Harvey Bernstein harvey_bernstein@mcgraw-hill.com  Ralph Gentile, Economist ralph_gentile@mcgraw-hill.com MHC Resource Websites:  www.construction.com www.construction.com  www.analyticsstore.construction.com  www.analytics.construction.com

35 35

36 Labour Supply and Demand George Gritziotis, Executive Director Construction Sector Council, Canada

37 37


Download ppt "1. “Analysis of Supply & Demand” Moderator: Harvey Bernstein, Vice President, Industry Analytics, Alliances & Strategic Initiatives, McGraw-Hill Construction."