Download presentation
Presentation is loading. Please wait.
Published byDouglas Cain Modified over 9 years ago
1
Public hearing: Committee of Transport and Tourism Brussels 7 May 2013 Newcomer´s perspective - 1 - The Fourth Railway Package – public hearing – Brussels 7 may 2013
2
- leather seats - 4 Bistros - Free WiFi - 4 to 10 Stewardesses / Stewards per train - 2 - WESTbahn – facts - house-tariff tickets: valid for 1 year - refund, exchanges for free - passenger charter (-25/50%) compensation for delays automatically credited ticket = coupon - route: Vienna – Linz – Salzburg – Freilassing - timetable 2013: about 3,16 million train kilometers - almost hourly traffic - 7 trains sets – double-deck – 501 seats; 200km/h
3
WESTbahn - expectancy before market entry - 3 - fair chance for invest payback fair competition non-discriminatory conditions
4
WESTbahn – report traffic permit & security certificate – in time, done Vehicle homologation in Switzerland – cross acceptance Austria (no automatic recognition of safety engineering in Germany) first WESTbahn timetable concept phase – outlook: travel time 2:45 Vienna – Salzburg first timetable offer: travel time 3:00; including a stop of 8 min (overtaking by ÖBB PV AG) regulatory proceeding in august 2011: settlement reached most trains travel time: 3:00 current timetable 2013 path allocation coached by regulator (2012) – fast compromise reached customer view: 4 long-distance trains departing/arriving from/to Vienna within 20 min – afterwards 40 min no service suboptimal result for the customer
5
WESTbahn – report competitive environment March 2010: amendment in the Austrian Federal Procurement act to allow direct awards over 100.000€ for public rail services February 2011: direct award retroactively from 4/2010 given to ÖBB-PV AG for 71,1 million train kilometers (timetable 2011) = nearly 80% of all local and long-distance services of ÖBB-PV AG Long-distance trains from Vienna-Salzburg are not part of the direct award WESTbahn started legal actions: pending at supreme administrative court current: new direct awards last announcement for direct award 3/2013: Linz- Graz for IC-trains to ÖBB-PV AG; starting from 12/2013 ( today served by WESTbus-offer) pricing: Three months before market entry of WESTbahn; new national offer from ÖBB- PV AG starting from 9€ After annual price increase between 2005-2009 from mid 2009 to today: just one price increase mid 2012 WESTbahn: complaint before the federal competition authority - 5 - Trains Vienna- Salzburg-Innsbruck- Switzerland: from Salzburg westwards with subsidies
6
WESTbahn – report - 6 - Infrastructure-usage fee: since 2012 strong increase – before: yearly small increase regulator initiated a proceeding Direct award to ÖBB-PV AG for nearly 80% of all regional-and long-distance train services includes the clause that additional infrastructure usage fees will be refunded by the state Non predictable costs high risk for newcomers to fail economically.
7
WESTbahn – report operative settlement few problems (sometimes local and after interruptions in the line security system) infrastructure: timetable information, platform information, announcement of trains,.. non-discriminatory train management on the line customer information and promotion: real-time data no access was granted WESTbahn regulatory proceeding resulted in a question and predecision of European Court of Justice in the meanwhile: access to the data has been granted by ÖBB-Infrastructure positioning of WESTbahn-promoters in the railway stations: at the beginning ÖBB Infrastructure fixed small sections to move/stand (1 x 1m); Security monitoring, high cost allocation for WESTbahn (regulator: different to ÖBB-PV AG) regulatory proceeding: ÖBB Infrastructure position was refused – now free access – free movement in the stations timetable and price-info-columns: first ÖBB Infrastructure approved only 50% of all ordered places in railway stations regulatory proceeding: a few days before decision meeting of the commission; all locations approved contracts with advertising companies imposed a ban on WESTbahn orders for station advertising intervention of regulator: changed contracts - 7 - with regulator help
8
WESTbahn – report essential facilities: WESTbahn timetable integration in ÖBB-PV AG system “Scotty” after antitrust proceeding: WESTbahn was integrated ticketing-link still refused timetable 2013, 2014 – path allocation timetable 2013: Regulator coaching from the beginning - compromise timetable 2014: currently smooth handling competition issues outside of the scope of the 4th railway package transport associations in Austria old contracts - for example in Salzburg - allow the incumbents (rail and bus) the exclusion of newcomers up to four years from the normal revenue sharing account payments: long delays financing: Eurofima with state guarantee financing versus free market financing for the newcomer - 8 -
9
WESTbahn – expectation versus reality - 9 - further improvements in non-discriminatory culture required support of regulator is essential – more competences needed for regulatory bodies private investors need predictable conditions unpredictable infrastructure cost development kills businessplans Customer-oriented timetable - even with competition (not 4 trains in 20 minutes – 0 trains in 40 minutes).
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.