Download presentation
Presentation is loading. Please wait.
Published byRoland Wilson Modified over 9 years ago
2
About the process … Calendar Committee Focus Groups Survey SAC Feedback (School Accountability Committee Participants) Student Feedback (High School Advisory Council) Principal Feedback (Modified Calendar principals)
3
Key Features Conventional Calendar Students begin Monday, August 8
5
Key Features Conventional Calendar Students begin Monday, August 8 Breaks – Fall, Winter, Spring
7
Key Features Conventional Calendar Students begin Monday, August 8 Breaks – Fall, Winter, Spring Semester ends before Winter Break
9
Key Features Conventional Calendar Students begin Monday, August 8 Breaks – Fall, Winter, Spring Semester ends before Winter Break CSAP testing window maximized Students end before Memorial Day
10
Key Features Modified Calendar Students begin Monday, August 1 Breaks – Fall, Winter, Spring CSAP testing window maximized Students end after Memorial Day
11
Key Features Track Calendar Students begin on Wednesday, July 6 Two week Winter Break Students end in June with approx 12 days between school years
12
Recommendation That the Board of Education support the proposed 2011- 2012 calendars compiled by the Calendar Committee. Why? 65% of those surveyed support the committee recommendation Findings for future committee consideration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.