Download presentation
Presentation is loading. Please wait.
Published byEustace Copeland Modified over 9 years ago
1
Lance Garrison R. Cooper, H.-O. Meyer, T. Mikev, L. Rebenitsch, R. Tayloe, R. Thornton
2
Prototype n Detector Precise event reconstruction Neutral current elastic (NCel) s: strange contribution to proton spin Neutrons 1-100 MeV Energy & direction spectra Important for low background experiments All Experimenters Meeting, FNAL December 19, 2011 At FNAL: MINOS Area Demonstrate event reconstruction Collect ~500 events Measure n fluxes Cosmogenic & beam related 100 m overburden Z0Z0 N N N N n n
3
Design Concept 3D grid of light collecting fibers immersed in liquid scintillator, no optical separation High channel density Readout with custom DAQ incorporating multi-anode PMT system All Experimenters Meeting, FNAL December 19, 2011
4
The SciBath Detector 80 L liquid scintillator (LS) 88% mineral oil 11% pseudocumene 1% PPO 768 (3-16x16) array wavelength-shifting fibers (x,y,z axes) 1.5 mm diameter 2.5 cm spacing UV → blue All Experimenters Meeting, FNAL December 19, 2011
5
The SciBath Detector Pulsed LED calibration All Experimenters Meeting, FNAL December 19, 2011
6
The SciBath Detector N 2 and LS plumbing All Experimenters Meeting, FNAL December 19, 2011
7
The SciBath Detector Electronics readout & PMTs All Experimenters Meeting, FNAL December 19, 2011
8
The SciBath Detector Electronics readout & PMTs All Experimenters Meeting, FNAL December 19, 2011
9
Timeline: SciBath at Fermilab All Experimenters Meeting, FNAL Production runs at ~0.5 pe threshold, 24/7 Calibration, runs at > 0.5 pe threshold Move, installation, setup, training, safety approval December 19, 2011
10
Deployment All Experimenters Meeting, FNAL December 19, 2011 SciBath Installed in MINOS near detector area, next to COUPP ~5 mrad off axis of NUMI beam
11
Monitoring Dual camera monitoring (plumbing & IRMs) Agilent power supply web controllable Full run control and monitoring available remotely 24/7 monitoring Expert on call within 30 min of detector All Experimenters Meeting, FNAL December 19, 2011
12
Monitoring Dual camera monitoring (plumbing & IRMs) Agilent power supply web controllable Full run control and monitoring available remotely 24/7 monitoring Expert on call within 30 min of detector All Experimenters Meeting, FNAL December 19, 2011
13
Monitoring Dual camera monitoring (plumbing & IRMs) Agilent power supply web controllable Full run control and monitoring available remotely 24/7 monitoring Expert on call within 30 min of detector All Experimenters Meeting, FNAL December 19, 2011
14
Monitoring Dual camera monitoring (plumbing & IRMs) Agilent power supply web controllable Full run control and monitoring available remotely 24/7 monitoring Expert on call within 30 min of detector All Experimenters Meeting, FNAL December 19, 2011
15
SciBath at Fermilab Overview Achievements Data Rates (~0.5 pe trigger) 6000Hz total, 500Hz per readout board, 8Hz per channel 1.7MB/s, 5.7GB/hr, 6.5TB total POT as of 12/12/11 6.4x10 19 POT total 4.8x10 19 POT production quality 95% live time, optimum 87% live time, overall Projected Final Results 7.5x10 19 POT total ~900 cosmic n ~300 events Goals ~500 events Requires ~10 20 POT Measure beam induced n flux Measure cosmic n flux ~20 events/day, ~60 days All Experimenters Meeting, FNAL December 19, 2011 Beam Configuration Events for 10 20 POT: CC Inclusive (CC quasi-elastic) : Low E 550 (100) : Med E 12000 (1400) : Low E 200 (30) : Med E4000 (1300)
16
Preliminary Results: Muon Event Display All Experimenters Meeting, FNAL Top View Side View Approximate Beam Direction December 19, 2011 Box Size ≈ Light Collected
17
Preliminary Results: Beam Response All Experimenters Meeting, FNAL December 19, 2011
18
Preliminary Results: Beam Time Regions December 19, 2011 All Experimenters Meeting, FNAL
19
December 19, 2011 Preliminary Results:
20
All Experimenters Meeting, FNAL December 19, 2011 Preliminary Results:
21
All Experimenters Meeting, FNAL December 19, 2011 Preliminary Results: Candidate n capture events!
22
SciBath (Near) Future Power down and drain LS to reservoir tank Leave detector underground over holidays Move to MINOS service building in January for 1 week calibration run No beam, cosmic , n Possible n flux measurement at MI-12 in Spring All Experimenters Meeting, FNAL December 19, 2011
23
Summary SciBath is an efficient 3D charged particle tracking detector → reconstruct neutral events Deployed at FNAL in MINOS near hall Desire to measure neutron backgrounds (cosmogenic and beam-related) Measure neutrino interactions ~2 months data collection ends this week! 1 week run in MINOS service building in January Possible run in MI-12 in Spring THANK YOU Fermilab! All Experimenters Meeting, FNAL December 19, 2011
24
Contact Us PI: Rex Tayloe (rtayloe@indiana.edu) Cell: (812) 219-1906 Office: (812) 855-3057rtayloe@indiana.edu Graduate Student: Lance Garrison (langarri@indiana.edu) Cell: (573) 999-9409 WH10W: x-3433langarri@indiana.edu Postdoc: Robert Cooper (roblcoop@indiana.edu) Cell: (734) 657-2890roblcoop@indiana.edu Other Group Members on this run of SciBath Graduate Student: Lori Rebenitsch Student Intern: R. Tyler Thornton Other Contributors to SciBath detector Technical / Engineering: Brandon Kunkler, Shing-Shong Shei, Gerard Vissar Faculty: H.-O. Meyer Former students: Melanie Novak (Gr.), Tyler Mikev (UGr.) All Experimenters Meeting, FNAL December 19, 2011
25
Anticipated Sensitivity (n events) Cosmogenic & beam-related, muon-induced n 100 m of rock overburden ⇒ 20 n / day Energy / direction spectra not well characterized* All Experimenters Meeting, FNAL *Mei & Hime, Phys. Rev. D 73 053004 (2006)) December 19, 2011
26
Low-Cost Digitization Solution 64-channel Integrated Readout Module 12-bit flash ADCs FPGA logic ARM-9 micro-controller with embedded Linux kernel “Ringing” oscillator input shaping 6U VME form factor (no VME backplane power) Ethernet transmission Built custom “in-house” All Experimenters Meeting, FNAL December 19, 2011
27
Low-Cost Digitization Solution 64-channel Integrated Readout Module 12-bit flash ADCs FPGA logic ARM-9 micro-controller with embedded Linux kernel “Ringing” oscillator input shaping 6U VME form factor (no VME backplane power) Ethernet transmission Built custom “in-house” All Experimenters Meeting, FNAL Power Inpu t ADCs FPGAs ARM- 9 December 19, 2011
28
Low-Cost Digitization Solution 64-channel Integrated Readout Module 12-bit flash ADCs FPGA logic ARM-9 micro-controller with embedded Linux kernel “Ringing” oscillator input shaping 6U VME form factor (no VME backplane power) Ethernet transmission Built custom “in-house” All Experimenters Meeting, FNAL December 19, 2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.