Download presentation
Presentation is loading. Please wait.
Published byJocelin Hall Modified over 9 years ago
1
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Mechanical Fitting Failure Reporting New DIMP Annual Report Requirements PHMSA Office of Pipeline Safety PHMSA Office of Pipeline Safety - 1 -
2
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Distribution Webinar Audio: 832-431-3335, Guest Code: 4018235#. Please mute your phone to reduce incidental noise. To ask a question: –Please click on the Q&A button on the LiveMeeting toolbar. –Type your question into the top portion of the Q&A window. –Press Ask when ready. - 2 -
3
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Webinar Agenda Christina Sames, AGA Welcome Roger Little, PHMSA Program Development Office Introductions and Overview Mike Israni, PHMSA Sr. Technical Advisor The new regulatory reporting requirement Sara Bukovnik and Bill McCarthy, PHMSA CIO Office The new electronic reporting tool Questions (submitted via Live Meeting) - 3 -
4
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Christina Sames AGA - 4 -
5
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Roger Little PHMSA Program Development Office - 5 -
6
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Introductions and Overview PHMSA provided the requirements for reporting the information collected in Parts D, E, and F on the Annual Report Form in the DIMP proposed rule and final rule. General reporting requirements for performance measures and EFV known since Final Rule in 2009- due soon! (3/15/2011) Mechanical fitting failures reporting starting now, due 3/15/2012, recognizing that quality of data would be impacted if we required it sooner (more on these topics coming up) - 6 -
7
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Future Webinars One Rule Forms and Dates Gas Transmission Annual Report- Webinar 3/31/2011 –Reporting deferred to 6/15/2011 LNG Forms – Webinar Spring 2011 – Reporting- LNG Incidents - 60 Days After Publication – Reporting- LNG Annual Reports – 6/15/2011 Operator Registry – Webinar – Early Summer 2011 –Reporting 1/1/2012 - 7 -
8
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Future Webinars One Rule Forms and Dates Electronic reporting required for all reports (1/1/2011) Change in gas incident reporting definition (3,000 MCF basis)- effective 1/1/2011 Gas Transmission Biannual IMP Reporting discontinued for 2/28 submission- reporting on new Gas Transmission Annual – 6/15/2011 - 8 -
9
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Webinar – Logistics REMEMBER: Phones will be on mute during the discussion Large number in attendance- will try to answer as many questions as possible Submit Questions via the Webinar Live Meeting tool Session and Questions will be posted on PHMSA Home Page - 9 -
10
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Mike Israni PHMSA Sr. Technical Advisor - 10 -
11
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Key DIMP Implementation Dates Final Rule Publish - Dec. 4, 2009 Effective Date of DIMP Rule - Feb. 12, 2010 Develop and Implement Plan - Aug. 2, 2011 Submit Gas Distribution Annual Report –Performance Measures & EFVs Installed –2010 Submission Due March 15, 2011 Mechanical Fitting Failures Reporting –Data Collection Start Date - Jan. 1, 2011 –2011 Submissions Due - March 15, 2012 - 11 -
12
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 12 Progression of Forms and Applicable Regulations
13
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Distribution Annual Report - 13 - Revisions incorporate the DIMP Performance Measures.
14
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 14 Mechanical Fitting Failure Report Form (F-7100.1-2) - Separated from Gas Distr. Annual Report - Collection begins 2011 calendar year -Reporting due 2012 Final Rule - Mechanical Fitting Failure Reporting Requirements to publish soon.
15
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Include nut follower, bolted, and stab mechanical fittings. All materials and as the result of any cause. Reporting Mechanical Fitting Failures
16
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Sara Bukovnik and Bill McCarthy PHMSA CIO Office - 16 -
17
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration How to Submit Reports All operators or their agents will have to register through the PHMSA portal via the ODES site http://opsweb.phmsa.dot.gov http://opsweb.phmsa.dot.gov You will need to know your OPID and ODES PIN to register in the Portal If you do not have an OPID and PIN or you cannot remember it, please go to http://opsweb.phmsa.dot.gov http://opsweb.phmsa.dot.gov The PHMSA Portal will be used to access all 2010 Annual Report forms and the Mechanical Fitting Failure Form. Click on “create account” - 17 -
18
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Registering Through the PHMSA Portal Users will need to enter their name, physical mailing address, phone number, email address, whether they are an employee or agent, and then create a user id Then to associate your name to an operator, the OPID and most current ODES PIN must be entered. Once the combination matches, your userid will allow you to submit reports for that Operator ID. This process will be repeated to associate addition OPIDs to your account. - 18 -
19
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Logging into the PHMSA Portal Users will receive an email with their userid and temporary password immediately upon registering Users will enter their userid and temporary password to enter the portal; then user will be immediately prompted to change their password. - 19 -
20
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Logging Into the Portal continued After successfully logging in, you will be asked to accept a disclaimer regarding accessing a US Government system. Click “Yes, I accept” - 20 -
21
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Logging Into the Portal continued If you have multiple OPIDs associated with your account, you will be asked to select the OPID you would like to view/submit reports for at that time. - 21 -
22
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Report History - 22 - Once you log in, you will be on the “Report History” page. This will display the reports, 2010 Gas Distribution Annual Report(s) or Mechanical Fitting Failure(s), that have been submitted to date. Reports can be exported as Excel or a PDF
23
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Viewing Reports - 23 - To view any 2010 Gas Distribution Annual Report(s) or Mechanical Fitting Failure(s) that have been saved or submitted, expand “View Reports” (by clicking on the “+”)
24
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Creating Reports - 24 - To create a 2010 Gas Distribution Annual Report or Mechanical Fitting Failure Report expand “Create Reports” (by clicking on the “+”), then select the report you would like to create. Note: Annual Reports expands to list all system types. The only option that will work at this time is Gas Distribution
25
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Creating Reports Continued - 25 - The Annual Reports option expands to list all system types. The only option that will work at this time is Gas Distribution. If you need to submit a Transmission Annual Report that option will be available at the beginning of May.
26
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Creating a Gas Distribution Annual Report - 26 - In an effort to reduce the reporting burden, the 2010 Gas Distribution Annual Report can be pre-populated with data submitted on the latest 2009 annual report, by selecting option “Create New Report - with data import” and Selecting the applicable State
27
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Creating a Gas Distribution Annual Report Continued - 27 - Report will be completed using the Turbo Tax approach, meaning the system will ask questions that complete the form, section by section. Data quality checks will be built in and enforced prior to submission. If information is unknown, a user can Save a draft to complete at another time.
28
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration FAQs URL: https://portal.phmsa.dot.gov/pipelinehttps://portal.phmsa.dot.gov/pipeline System should be available to complete Gas Distribution Annual Reports and Mechanical Fitting Failures starting on Jan 24, 2011. Unless you have received an exception from PHMSA, to report via paper, all reports MUST be submitted online per the One Rule. All 2010 Annual Reports and Mechanical Fitting Failures will be submitted through the PHMSA Portal. All other forms incident/accident and 2009 and prior Annual Reports will still be submitted using OPID and ODES PIN in via the ODES application - 28 -
29
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Q&A - 29 - Please click on the Q&A area in your Live Meeting window to view questions and answers being submitted
30
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Contacts and Other Information Online Data Entry System at: http://opsweb.phmsa.dot.gov/ Forms available at: http://www.phmsa.dot.gov/pipeline/library/forms Webinar posted at: http://phmsa.dot.gov/pipeline/library DIMP Coordinator: Chris McLaren »Chris.McLaren@dot.govChris.McLaren@dot.gov »(281)216-4455 Roger Little: Roger.Little@dot.govRoger.Little@dot.gov Mike Israni: Mike.Israni@dot.gov - 30 -
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.