2
1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6. 2 Purchase Land
3
Rigorous review of records (including historic maps and aerial imagery) Review of historic databases for environmental issues Site inspection Interviews with owners, occupants, neighbors, and local government officials There were no indicators, or triggers discovered that would indicate the need to do further investigation (Phase II Assessment) for soil or water contamination 3
4
Executed twenty-six (26) soil test borings. Borings were drilled to depths ranging from 10 to 50 feet below the existing ground surface. Performed a laboratory testing on each boring Provided foundation, lateral earth pressure, and pavement design recommendations Minor risks noted with soil settlement typical to construction projects Nothing noted from report that couldn’t be mitigated by design 4
5
5 We are seeking a motion to purchase this land from Mr. Cahill located at 740 Figsboro Road in the amount of $545,000 pending approval of appropriated funds from the Henry County Board of Supervisors