Download presentation
1
Floating Production Systems
Presentation at Tulane Energy Week 2010 Jim McCaul – IMA
2
Outline of Presentation
Overview of FPS Technology Current FPS Situation FPS Projects Being Planned Forecast of FPS Orders International Maritime Associates
3
Four Basic FPS Solutions
FPSO Production Semi Tension Leg Platform Production Spar International Maritime Associates
4
FPSO Weathervaning Spread Moored
Serpentina FPSO Pazflor FPSO International Maritime Associates
5
FPSO PRO Has field storage and can be used in remote locations.
Can operate on shallow or ultra-deepwater fields. Less weight sensitive than other types of FPSs. Leasing transfers some risk from field operator to contractor. Assumed residual value a competitive tool in leasing bids. Deck area allows flexibility in process plant layout. Surplus/aging tankers can be used for conversion. Can be modified/redeployed following field depletion. Quick disconnect turrets enable emergency relocation. CON Subsea tiebacks create higher well maintenance costs. Turret/swivel machinery expensive, high maintenance. Redeploying an FPSO not as easy as it may appear. International Maritime Associates
6
Production Semi PRO Relatively wide deck space provides good layout footprint for process plant. Can support large number of risers. Has relatively little surface motion. Water depth not a limitation. CON No storage – requires either an FSO or pipeline offtake. Hull weight carrying capacity imposes limitations on deckload. Deck space more limited than large FPSO. Dry tree designs developed, but to date wet trees utilized with production semis. P-51 Production Semi International Maritime Associates
7
Tension Leg Platform PRO
Surface motion limited by tendon tension, providing stable platform for dry trees. CON Tendon weight grows with water depth and increasingly restricts deck payload capacity. Deepest TLP water depth to date has been Magnolia, in 1430 meters water. TLPs are inherently unstable and will capsize if tendons fail. ETLP Moses TLP Sea Star TLP International Maritime Associates
8
Production Spar PRO Can accommodate dry trees.
Water depth does not seem to be a limitation – Perdido Host spar is in water depth of 2400 meters. Spars can provide storage but to date no spar has been used in this capacity. Inherently stable, will remain upright if moorings fail. CON Need to utilize heavy lift or floatover for hull/topsides mating – an expensive proposition. Kikeh Spar International Maritime Associates
9
Optimum Application Range
Source: FloaTEC, Review of Deepwater Floating Structures and Dry Tree Semi Developments, November 2006 International Maritime Associates
10
FPS Units in Operation (as of July 2010)
22 tension leg platforms 43 production semis 152 FPSOs 18 production spars 8 production barges 5 FSRUs 95 FSOs International Maritime Associates
11
Where FPSs are Operating (as of July 2010)
International Maritime Associates
12
FPSs Being Built/Converted (as of July 2010)
39 FPSOs (16 new, 23 conversions) 4 production semis (new) 1 TLP (new) 1 FSRU (conversion) 4 FLNGs (new) 3 MOPUs (2 new, 1 conversion) 2 FSOs (1 new, 1 conversion) International Maritime Associates
13
Where FPSs Are Being Built (as of July 2010)
International Maritime Associates
14
FPS Construction Has Shifted to Asia (number of facilities involved in FPS construction/conversion)
International Maritime Associates
15
Where FPSs Will Be Installed (as of July 2010)
International Maritime Associates
16
Trend in FPS Order Backlog
International Maritime Associates
17
FPS Projects Planned/Under Study (as of July 2010)
International Maritime Associates
18
Forecast of FPSO Orders Over the Next Five Years
International Maritime Associates
19
Forecast of Production Semi Orders Over the Next Five Years
International Maritime Associates
20
Forecast of TLP Orders Over the Next Five Years
International Maritime Associates
21
Forecast of Production Spar Orders Over the Next Five Years
International Maritime Associates
22
Forecast of FSO Orders Over the Next Five Years
International Maritime Associates
23
Summary Forecast of FPS Orders Over the Next Five Years
Most Likely Scenario Scenario 1 $50-70 Oil Scenario 2 ~$80 Oil Scenario 3 $ Oil Type FPSO No. Units Total Capex (bil of $) Production Floaters FPSOs 95 $56.6 120 $67.1 150 $81.8 Semis 10 $5.6 12 $6.1 14 $6.7 TLPs 3 $2.2 4 $3.2 5 $3.8 Spars $1.5 $1.8 $2.1 All production floaters 111 $65.9 140 $78.2 174 $94.4 Storage Floaters FSOs 25 $2.6 30 35 $3.7 Total Market 136 $68.5 170 $81.4 209 $98.1 International Maritime Associates
24
International Maritime Associates, Inc. Website: www.imastudies.com
th Street, NW — Suite 350 Washington, DC USA Tel: (Washington) Tel: (Houston) Fax: Website:
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.