Download presentation
Presentation is loading. Please wait.
Published byCornelia Douglas Modified over 9 years ago
1
Value for one – Value for all Dan Russell – Director Construction Technology Eric Cylwik – Modeler II – Heavy / civil division Sundt Construction, inc.
2
BIM = Building Information Model (object) BIM = Building Information Modeling (process) VDC = Virtual Design and Construction (process) Process is much more important than object InformationSharing
3
Need for Construction Technology for Highway Design & Construction Solutions BIM historically has been vertical focused With a few exceptions, little has been done on horizontal projects Software providers have been focused vertically Owners drove change in vertical world
4
No Value without Input Value comes from o Applications in field o Better Communication o Re-purposing Information Upstream o Exploring Possibilities in real time o Communication Vs. Assumption
5
Real world examples
6
Accurate Validation Now
11
+ + =
12
RUTHRAFF
17
Real World Examples
24
Comparing Digital Models
27
Communication -- No strings attached
30
Accurate & Exact: For Design For Estimating For Planning For Surveying For Doing
31
Quantification & Qualification o Test typical on ALL scenarios Downstream Communication o Only adding information, not recreating o Machine Control o Visual feedback Less to be Assumed o Daily lift models o 3D model review with contractor/subs/craft o 3D Visuals for communication with public
32
VALUE FOR ONE – VALUE FOR ALL DAN RUSSELL – DIRECTOR CONSTRUCTION TECHNOLOGY DNRUSSELL@SUNDT.COMDNRUSSELL@SUNDT.COM480-293-3375 ERIC CYLWIK – MODELER II – HEAVY / CIVIL DIVISION EECYLWIK@SUNDT.COMEECYLWIK@SUNDT.COM480-293-3302 www.sundt.com SUNDT CONSTRUCTION, INC.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.