Download presentation
Presentation is loading. Please wait.
Published byRichard Goodwin Modified over 9 years ago
1
MPLS-TP OAM Framework draft-ietf-mpls-tp-oam-framework-07 editors: Dave Allan, Italo Busi, Ben Niven-Jenkins
2
Changes Since Anaheim We’ve rev’d the document twice Processed the comments of two “last calls” –Including liaisons from SG15 “Tightened Up” the document significantly –Terminology Changes PST SPME –Terminology Clarifications Too many to mention –Concept clarifications Up & down MEP, per node/per interface MIPs Some implications of instantiating SPMEs –Noting actual procedures are “out of scope”
3
Changes Since Anaheim-2 Some changes of note –Uniform model of TTL copying allowed for SPMEs Implication being TTL will address SPME MIPs, which can then only use of an “out of band” return path –Operation of LKI and LKR significantly clarified
4
Fault Reporting A D B C S-PE PP PW MEG LSP MEG MEP MIP Server MEG LSP AIS C detects a failure on the B-C Link that affects the A-D LSP MEP LSP AIS MEP D detects loss of continuity on the A-D LSP that affects the PWs carried over the LSP PW AIS B detects a failure on the B-C Link that affects the A-D LSP MEP A detects loss of continuity on the A-D LSP that affects the PWs carried over the LSP PW AIS
5
Lock Reporting A D B C S-PE PP PW MEG LSP MEG MEP MIP Server MEG LSP LCK PW AIS MEP A detects loss of continuity on the A-D LSP that affects the PWs carried over the LSP PW AIS The B-C Link is locked at B in both directions MEP D detects loss of continuity on the A-D LSP that affects the PWs carried over the LSP
6
Open Issues Practical limits of detecting “unexpected OAM encapsulation”, a.k.a. mis-connectivity defect –How far into heuristics do we want to mandate? Short pipe and uniform models for SPMEs –Decoupling the configuration of TTL and TC copying is not actually mandated anywhere Description of SPME MEGs –Can be any two points before SPME is setup Providing SPME does not “overlap” other SPMEs –These two points become "adjacent" at the LSP sub- layer after the SPME is setup
7
Next Steps The document is quite close to a “last” last call –Third time lucky? We’ll look to resolve the last few outstanding issues and request a last call before Beijing
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.