1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development December 2, 2009
2
2 High Capacity Transit System
3
3 High Capacity/Light Rail Transit Funding Sources 57-mile system funding: Tempe Sales Tax - 1996 (Prop 400) Phoenix Sales Tax - 2000 (Prop 2000) Mesa General Fund Glendale Sales Tax – 2001 (Prop 402) Regional Sales Tax 2004 (Prop 400) Federal Transit Administration (~40%)
4
4 20-Mile Light Rail Line
5
5 Why Did We Select This Corridor First? Corridor has highest travel demand High demonstrated bus ridership Highest employment concentrations Good residential base High student population Corridor contains most special event facilities
6
6 Light Rail in Street Median
7
7 Light Rail Vehicle 50 Vehicles Heat reflective paint Low E, solar reflective windows Insulated car bodies to reduce cooling loss Bicycle racks, wheelchair accessible
8
8 “Cool Screen” Station 28 stations Louvers & tensile fabric maximize shade Benches, art & plants Chilled water fountains
9
9 Unique Art at Each Station 19 th Ave and Camelback44 th Street and Washington Roosevelt and Central Dorsey and Apache 1 st Ave and Jefferson
10
10 Park-and-Ride Locations
11
11 Future Airport Connection via Sky Train Phase 1 - 2013
12
12 Operations Frequency – Weekdays – 10 mins peak hours -20 mins off peak Saturday - 15 mins peak hours – 20 mins off peak Sunday and Holiday -20 mins all hours of day Operations Monday thru Thursday 4 a.m. – midnight Friday 4:40 a.m. to 3 a.m. (Sat) Saturday 4:30 a.m. to 3 a.m. (Sun) Sunday 4:30 a.m. to midnight
13
13 Total Average Daily Boardings
14
14 Average Daily Boardings
15
15 Intercept Survey Results April 2009 35% never used transit the year before 40% used transit on a weekly basis 45% walked to a METRO station 29% drive and 26% transfer from a bus 40% utilize METRO to/from home for needs other than work or ASU 27% use METRO for work and 12% for ASU 68% of those surveyed had at least 1 car available for their trip
16
16 Development along 20-mile Route 2004 to Present $7.4 billion total investment along alignment (planned, under construction, or completed) $5.9 billion private investment $1.5 billion public investment 17,000+ residential units 9+ million square ft. commercial 3,200+ hotel rooms $1.4 billion $7.4 billion Light rail investment Non-rail investments
17
17 High Capacity Transit System
18
18 Northwest LRT Extension
19
19 NW LRT Extension Overview Project Length = 3.2 Miles Stations = 3 Park-and-Ride = 500 spaces Construction Cost = $250 million (YOE) Doesn’t include ROW or design Funding – City of Phoenix and Regional PTF No federal funds
20
20 Northwest LRT Extension Status Design Completed – April 2009 Real Estate Acquisition – Spring 2010 Construction – Delayed Construction team under contract Small street project next summer Evaluating various funding alternatives, including federal funds
21
21 Central Mesa LRT Extension
22
22 Central Mesa Project Highlights Project Length = 3.1 miles Cost Estimate = $227M (YOE$) Funding Sources: 5309 Small Starts = 33% CMAQ = 15% Regional PTF = 52% November 2009 – submitted request to FTA to enter Project Development
23
23 Tempe South Study Area Tempe South Corridor Study Area
24
24 Tempe South Corridor Rural Road Bus Rapid Transit
25
25 Tempe South Corridor Mill Avenue Modern Streetcar
26
26 Phoenix West Extension High Capacity Transit Alignment in the I-10 median west of I-17 MAG adopted – July 2008
27
27 Phoenix West Extension 50’ median for future mass transit preserved as part of I-10 completion
28
28 I-10 Freeway HCT Transition
29
29 LRT Alternative: I-17 – Jefferson – Washington/Jefferson
30
30 Bus Rapid Transit BRT: Los Angeles Metro Orange Line
31
31 Bus Rapid Transit Alternative
32
32 High Capacity Transit System
33
33