1 Our Process ElevationArm Tower FrontBack
2
2 Operational Definition Need two things: –a method of measurement or test –a set of criteria for judgment For example, what are operational definitions for the following: –on-time delivery –good service –50% wool blanket source: Moen, Nolan and Provost, Improving Quality Through Planned Experimentation
3
3 Data Collection Collect 5 data points for each team member Plot run chart (use chart wizard) Construct a histogram (Data | Data Analysis | Histogram) Construct a box and whiskers plot (use box&whiskers.xls) Calculate x-bar and s (Data | Data Analysis | Descriptive Statistics) Discuss results and be prepared to brief results to other groups
4
4 Data | Data Analysis Descriptive StatisticsHistogram
5
5 Box and Whiskers XLS Insert | Line Chart
6
6 What the Exercise Statistics Reveal The sample mean (x-bar) describes typical distances in one number. Other measures of central tendency include: median and mode. The sample standard deviation (s) provides a measure of the ‘average’ deviation around the mean.
7
7 Using x-bar and s The empirical rule assumes the underlying distribution is normal: – 68% within ± 1 s – 95% within ± 2 s – 99 % within ±3 s For any distribution: – At least 75% within ± 2 s – At least 89% within ± 3 s
8
8 Histograms Shows the distribution of process outcomes. Look for center, shape and spread Compare to: –your expectations and knowledge –target and specification requirements –across shifts, operators, machines, etc
9
9 Process capability EXCEL: =Normdist(x, mean, std dev, 1) to calculate percent non-conforming material.
10
10 Process capability measure Estimate standard deviation: Look at standard deviation relative to specification limits Don’t confuse control limits with specification limits: a process can be out of control, yet be incapable ˆ = R / d 2 33 Upper Specification Limit (USL) Lower Specification Limit (LSL) X-3 A X-2 A X-1 A X X+1 A X+2 X+3 A X-6 B X X+6 B Process A (with st. dev A ) Process B (with st. dev B ) x C p P{defect}ppm 1 0.330.317317,000 2 0.670.045545,500 3 1.000.00272,700 4 1.330.000163 5 1.670.00000060,6 6 2.002x10 -9 0,00 The Statistical Meaning of Six Sigma
11
11