Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005.

Similar presentations


Presentation on theme: "Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005."— Presentation transcript:

1 Cross London Rail Links Ltd

2 Crossrail the Challenge Keith Berryman 20 December 2005

3 n Map1 The Scheme

4 Crossrail Capital Cost £ billion Point Estimate7.6* Estimate Including Contingency 10.1* Outturn Costs16.8 *Current Estimate in 1Q02 prices excluding rolling stock and LUL works at TCR station.

5 n Map1 Western Section Eastern Section Central Section South East Section Depot Geographic Breakdown

6 n Map1 1.2 1.6 2.7 Capital Cost by Section (£bn.) 4.8 6.4 10.6 0.6 0.8 1.3 0.9 1.2 2.0 0.2 0.3 0.4

7 Horizontal Cost Breakdown n ‘On Network’ works £1.8 bn (perhaps carried out by Network Rail) n Depot (perhaps part of Rolling Stock lease) £0.2 bn n Central area systems (perhaps leased) £0.8 bn n Central area civil infrastructure£4.8 bn NB: All capital cost point estimates excluding contingency in 1Q02 prices

8 Value of the Branches Central Infrastructure provides capability, branches create the demand/revenue. For instance: Central Section + Shenfield Branch + Depot Cost £5.6 bn (73% of the total scheme) Delivers about 50% of benefits A reduced scheme offers proportionately less benefit.

9 Operating Income Typical operating income (5 years after opening) n Annual Revenue* (gross)£485m n Abstraction*(from existing services)£259m n Annual Revenue*(net)£226m n Possible annual increase in tax revenue* £62m (1Q02 prices), For details refer to: www.crossrail.co.uk/aboutus/economicappraisalwww.crossrail.co.uk/aboutus/economicappraisal

10 Abstraction (annual figures) n From National Rail£148m n From London Underground £96m n From others (DLR, buses etc.) £15m

11 Transport Economic Case £billion PV n Capital Cost10.6 n Maintenance Costs1.6 n Operating Costs1.7 n Less Transport Revenue-6.1 n Plus tax loss (switch to tax free public transport) 1.2 Total Cost to Government8.9 Transport Economic Benefits 16.1 Benefit Cost ratio1.8:1

12 But Significant Wider Economic Benefits Crossrail enables employment growth in London otherwise constrained by lack of transport capacity, with the approximate results: n 35,000 extra Central London Jobs n Increased output at £10bn PV GDP growth. n Increase productivity of all jobs £3bn PV GDP growth. n Increases government tax revenues.

13 Challenges n Olympics: Managing the relationship. n Cost and Risk: Reducing cost and improving confidence. n Interfaces: Managing the physical and contractual risk at the project boundaries. n Capacity: Planning for industry and market capacity. n Affordably: Developing a scheme that can be funded.

14 Current Activity n Hybrid Bill: Royal Assent early/mid 2007. n Traditional Transport Economic Case proven, wider benefits are gaining recognition. n Secretary of State has committed funding to the Development Phase. n Project focused on improving certainty of scope, programme and cost. n Working with our Sponsors to develop a robust and affordable funding strategy.

15 Cross London Rail Links Ltd END


Download ppt "Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005."