Project Plan Reverse Engineering of a Radio Control Race Car
Team The C.O.R.E Presenters: Moemen Taha Omar Al-Ameri The Petroleum Institute Abu Dhabi, United Arab Emirates
2
Outline Introduction Background Information Project Statement
Engineering Methodology Key Milestones Gantt Chart Total Cost and Budget Conclusion
3
Introduction The project is about enhancing the radio controlled race car through improving its aerodynamics. This presentation will give an outline of the total project including the key milestones and the total budget
4
Background Information
The RCRC: First RC motor was built in the 1940’s. RC car racing began in the 1960's as a hobby. In the 1970s several U.S. remote-controlled car companies started manufacturing RC cars commercially. Competitions began by 1979. The Aerodynamics: Started in the 17th century and still being studied up till today. 4 forces : Drag Thrust Lift Weight
5
Project Statement After gaining knowledge of new aspects, it is now possible to develop a project plan to reverse engineer the radio control car: The project statement is as follows: Gain better understanding of aerodynamics and implement what was learnt. Achieving the highest outcome possible from the team members. Improving our hand skills and performing what was learnt in to reality.
6
Engineering Methodology
Pre-dissection process: Background information from various sources. Dissection process: Disassembling a sample RCRC to get the idea of how it works. Investigate any potential improvements. Evaluation of the improvements suggested and creating several conceptual designs. Prepare a detailed descriptions of the final chosen design including the materials, dimensions, weight and cost. Building the final design prototype. Usage of Ms Project.
7
Key Milestones Task Sub Tasks Starting date Finishing date
Team Building Creating a team charter, establishing goals, rules and mission of the team Wed 2/2/11 Wed 2/9/11 Background Research Researching the history of RC race cars, aerodynamics, types, manufacturing process and cost Thu 2/3/11 Sun 5/8/11 Project management plan Project schedule, identifying project tasks, team resources and project tracking Sun 2/27/11 Thu 5/12/11 Reverse engineering process Identifying components, assembling method and generating improvement ideas Tue 3/8/11 Mon 4/25/11 Building a prototype Creating a 3D module of the final design Mon 5/16/11
9
Payment rate in AED per Hour
Total Cost and Budget Resource Payment rate in AED per Hour Total working hours Total cost in AED Ahmed Awad 100.00 80 8,000.00 Omar Al-Ameri 82 8,200.00 Moemen Taha 80.00 79 6,320.00 Ranuk De Silva 81 6,480.00 Machine Shop 200.00 12 2,400.00 Computer Lab 25 2,500.00 Background research 2,000.00 Project tracking 1,000.00 Total cost 36,900.00
10
Conclusion The C.O.R.E team have achieved the desired goals in the pre-dissection analysis. The project will cost approximately 67,000 AED. Waiting for client’s approval to start executing the project.
11
Please feel free to ask any questions?
Thank you for your time! Please feel free to ask any questions?