2012 Section Engineer Meeting Wednesday October 3, 2012 Presented by Steve Applegate – Project Consultant Tom Nein - Plate Production & Plant Manager
2
ABC Concepts ALSP & ALBC Shapes Manufacturing Location KYTC Local Projects & History Kentucky Support Team Questions Agenda
3
Accelerated Bridge Program
4
Accelerated Bridge Construction (ABC): ABC is bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges Prefabricated Bridge Elements and Systems PBES are structural components of a bridge that are built offsite, or near- site of a bridge and include features that reduce the onsite construction time and the mobility impact time that occurs when building new bridges or rehabilitating or replacing existing bridges relative to conventional construction methods. Accelerated Bridge Program
5
+ = ABC Many of our bridge products can be combined with Express Foundations to help you meet the goal of Accelerated Bridge Construction.
6
Structural Plate Shapes 6
7
Aluminum Structural Plate - Design & Loading Aluminum Structural Plate in AASHTO Material – AASHTO M219 Design – AASHTO Section 12 Installation – AASHTO Section 26 Loading – HS-25 and LRFD Highway Loading
8
Aluminum Structural Plate - Shapes Several Shapes allowed in AASHTO Section 12; Round Pipe Arch True Arch on Footings Ellipse Box Shape
9
Structural Plate Pipe Arch
10
Aluminum Structural Plate Aluminum Structural Plate Advantages Easy to Design Quick to Install Cost Savings over Concrete Structures Industry Competition Durability History % Recycled Material Made in Kentucky Twin Aluminum Plate installed 1968 – No corrosion
11
Aluminum Box Culvert – Slip Line of Failing Concrete Box road traffic maintained during construction
12
17’ Span Aluminum Arch on Footings with Slope Collar
13
10’ Span ALBC on Precast Footings
14
Benefits to You: Provides ease and speed of installation Alleviates hazardous working conditions Trapezoidal foundation reduces wing wall concrete quantities Minimal reinforcement to be placed on site Pick weights and sizes customized to your equipment Use with Aluminum Plate or CON/SPAN Structures Blends the speed of precast with the economy of cast-in-place EXPRESS Concrete Footings – Speed and Ease
15
Construction Process: Excavate and prepare foundation subgrade Unload and set precast channels Place minimal reinforcing at joints to provide foundation continuity Set precast bridge units, headwalls and wing walls Pour cast-in-place concrete Seal joints, grout wing walls and backfill. Helping Accelerate Bridge Construction
16
+ = ABC Many of our bridge products can be combined with Express Foundations to help you meet the goal of Accelerated Bridge Construction.
17
Accelerated Bridge Construction (ABC): ABC is bridge construction that uses innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the onsite construction time that occurs when building new bridges or replacing and rehabilitating existing bridges Prefabricated Bridge Elements and Systems PBES are structural components of a bridge that are built offsite, or near- site of a bridge and include features that reduce the onsite construction time and the mobility impact time that occurs when building new bridges or rehabilitating or replacing existing bridges relative to conventional construction methods. Accelerated Bridge Program
18
Winchester Plant 18
19
Manufactured in Winchester KY Established 1985 Acres 19 180,000 SF Mfg Operation Plant Capabilities Galvanizing Tank On-site water treatment facility 2 roll forming lines 19 overhead cranes 12 presses 4 press brakes Various sheers, band saws and curving rolls Machine shop Capacity – Running at 35% potential capacity
20
Galvanizing TankStructural Plate Presses Winchester Plant 20
21
ALSP Press AreaInventory Area Winchester Plant 21
22
Winchester Plant Products Multi-Plate Super-Span AL Structural Plate AL Box Culvert
23
Winchester Plant Products Collector Pans Bin Wall Metric Sheeting Tunnel Liner
24
Kentucky Applications
25
37 Maintenance Projects 10 Monthly Letting Projects KYTC ALBC Installation / Utilization
26
Little Bennett Regional Park, Clarksburg, MD 10’-6” ft. span x 5’-7” 40.5 lf ALBC Loading: HS25 Engineer: Tim Sharp Dist 3 Installed: Nov 2010 Location: Richardsville Kentucky 263 4 Day Road Closure Accelerated Construction 4 Day Road Closure
27
Little Bennett Regional Park, Clarksburg, MD 25’3” ft. span x 10’-2” 66 lf ALBC Loading: HS25 Engineer: Paul Sanders Dist 4 Installed: June 2010 Location: Caneyville Kentucky 2766 Emergency Replacement
28
Little Bennett Regional Park, Clarksburg, MD 25’4” ft. span x 8’-7” 24 lf ALBC Loading: HS25 Owner: Webster County Road Rob Mooney Installed: Oct 2011 Location: Clay KY Williams Clay Road Webster County County Road Department ALBC
29
Bid as an alternate (22’1”span X 6’6” rise Aluminum Box Culvert) to Concrete Bridge on piles in 1995 Saved $310,000 versus concrete bridge Improved Road close time from 3 months to 1 week Increased road width to allow for wider entrance for Pikeville Elementary School – Chloe Creek US 223 and Hwy 1460 KYTC DIST 12 – 22’ Span ALBC – Before and After
30
KYTC DIST 12 Chloe Creek – Remove Old Bridge
31
KYTC DIST 12 – Prepare 4,000 PSF foundation
32
KYTC DIST 12 – Assemble Box in Parking Lot while old bridge is taken out and foundation prepared
33
KYTC DIST 12 – ALBC ready for backfill
34
After 17 years of HS-25 Coal Haul Traffic
35
Kentucky Support Team 35
36
Questions? 36
37
Kentucky Support Team
38
Summary & Overview Bridge Portfolio Innovative Bridge Developments Engineering Support & Design Tools CONTECH’s Consultative Approach Building Blocks to a successful Project Planning & Solution Development Project Design Worksheet Structure Selection Site & Layout DYOB Engineer Estimate Site Simulation Proposal Preparation Design Build Support Design Support Specifications Contract Drawings Permitting Structural/Fabrication Drawings Approval Assistance Custom Shape Development Horizontal/Vertical Alignment Hydraulics & Scour Support Foundations Installation Support Preconstruction Meeting On-Site Installation Assistance Logistics Coordination Contech. Your project partner.
39
Sales Team Territory Map 39
40
Field Marketing Territory Map 40
41
Questions? 41