Download presentation
Presentation is loading. Please wait.
Published byJeffry Townsend Modified over 9 years ago
1
Solution MGMT E-5070
5
1 st Quarter Forecast for the Fourth Year
8
Naïve Approach Tracking Signals
9
Tracking Signal Chart Naïve Approach Qtr Qtr Qtr Qtr Qtr Qtr 1 2 3 4 5 6 7 8 9 10 11 12 + 3 + 2 + 1 0 - 1 - 2 - 3 UPPER CONTROL LIMIT LOWER CONTROL LIMIT NONE TRACKING SIGNAL Tracking Signal Tripped UCL
11
1 st Quarter 4 th Year Forecast
14
2-Quarter Moving Average Tracking Signals
15
Tracking Signal Chart Two - Quarter Moving Average Approach Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr 3 4 5 6 7 8 9 10 11 12 + 3 + 2 + 1 0 - 1 - 2 - 3 UPPER CONTROL LIMIT LOWER CONTROL LIMIT NONE TRACKING SIGNAL Tracking Signal Tripped UCL
21
Trend Line Tracking Signals
22
Tracking Signal Chart Trend Line Regression Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr 1 2 3 4 5 6 7 8 9 10 11 12 + 3 + 2 + 1 0 - 1 - 2 - 3 UPPER CONTROL LIMIT LOWER CONTROL LIMIT TRACKING SIGNAL Narrow CL Wide CL
23
Tracking Signal Chart Trend Line Regression Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr Qtr 1 2 3 4 5 6 7 8 9 10 11 12 + 3 + 2 + 1 0 - 1 - 2 - 3 UPPER CONTROL LIMIT LOWER CONTROL LIMIT TRACKING SIGNAL
28
Solution MGMT E-5070
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.