Download presentation
Presentation is loading. Please wait.
Published byFranklin Gibbs Modified over 9 years ago
1
13-8-2015 Rotterdam Electric
2
13-8-2015 2 Ambition 50% C0 2 -reduction in 2025 compared to 1990 100% climate proof in 2025 Improved air quality Economically strong city
3
13-8-2015 3 3 Sustainability Program 2011-2014 Goal: Rotterdam as a clean, green, healthy and economically strong city. Objectives for Electric Mobility in the Sustainability Program: Reduce CO 2 emissions as leading city Improve energy efficiency Promote sustainable mobility and transport Promote clean air and reduce noise hindrance Enlarge sustainable investments and promote sustainable products and services
4
13-8-2015 4 Benefits of Electric Mobility Internal combustion engine ~ 15% Electric engine with fossil electricity ~ 25% Electric engine with green electricity ~ 65% Important for Rotterdam: - Locally zero-emission - Less CO 2 emissions in the total energy chain - Less noise hindrance - Maintain good accessibility by car
5
13-8-2015 5 5 Rotterdam Electric Goal: encourage the use of electric vehicles At least 1.000 charging stations in 2014 A covering network of charging stations for e-bikes and e-scooters Replacement of 4.000 petrol scooters by e-scooters A portfolio of innovation projects on electric mobility All new parking garages are designed to be ‘EV-Ready’ 25% of the municipal vehicle fleet is electric or hybrid in 2014
6
13-8-2015 6 Rotterdam Electric Charging Infrastructure Electric 2- and 3-wheelers Innovation Projects and Vehicle Fleets Collaboration and Lobby Monitoring & Communication
7
13-8-2015 7 Charging Infrastructure Targets: 1.1000 charging points linked to vehicle owners: -Private terrain: subsidies (€ 1.000 and € 450 for green electricity) or -In parking garages or -In public space 2.60 charging stations at strategic locations 3.Fast-charging
8
13-8-2015 8 Electric 2- and 3-wheelers Network of charging stations installed in public bicycle sheds Old target: replacement of 4.000 fossil scooters with e-scooters, promoted with financial incentive (demolition premium) In 2011 city council decree against demolition premium E-scooter promotion remains political priority Potential new target: by 2014 15% of the newly sold scooters is an e-scooter (innovators & early adopters)
9
13-8-2015 9 Electric 2- and 3-wheelers - Projects E-scooter platform Rotterdam Electric Scooter Factory Rotterdam Experience to convince 2.0 E-scooter in municipal vehicle fleet Charging stations in public bicycle sheds Electric food delivery Scooter party @ RDM Domino’s and Croon TBI as forerunners New Experience to convince 3.0 Electric thuisbezorgd.nl (takeaway.com) Electric scooter experience HNR|EVC
10
13-8-2015 10 Innovation Projects Target: Promote and/or facilitate projects of external stakeholders which implement innovations with electric transport Assessment criteria per project: External stakeholder initiative Added value for Rotterdam Uniqueness in the region Up scaling potential
11
13-8-2015 11 Innovation Projects - Milestones Pilot with 75 electric vehicles in Rotterdam Pilot with 25 electric car sharing vehicles in the 4 big cities Electric Tuc Tuc transport by Flex Overschie Pilot with 4 electric hybrid busses at RET Start of ESFA: Electric Scooter Factory Rotterdam Application of 2 hybrid heavy garbage trucks Fast charging stations
12
13-8-2015 12 Innovation Projects - Milestones Launch of the Electric Vehicle Center
13
13-8-2015 13 Innovation Projects Possible new innovation projects in 2012 and beyond Electric city distribution Electric taxis Full-electric city busses …
14
13-8-2015 14 Sustainable City Logistics Transport Analysis Binnenstadservice Environmental Zone Nighttime Distribution ECOSTARS Together with public and private partners in the city
15
13-8-2015 15 Transport Analysis (2008)
16
13-8-2015 16 Binnenstadservice Rotterdam Reduction of 150 trips per week compared to 2010
17
13-8-2015 17 Environmental Zone for trucks > 3.5t
18
13-8-2015 18 Nighttime Distribution In Rotterdam: Noise constraints (23:00 – 7:00 < 60 dB) Distribution time frame constraints (e.g. 7:00 – 17:00)
19
13-8-2015 19 Nighttime Distribution 17% CO2 reduction because of fuel savings Less vehicles needed for the same deliveries due to: 1. Use of larger trucks 2. Operation without time frame constraints Agreement: all supermarkets joined
20
13-8-2015 20 ECOSTARS
21
13-8-2015 21 ECOSTARS Incentives for transport companies 8 European cities, 3 years Goods and people Vehicle fleet scan Score: stars Award: incentives
22
13-8-2015 22 Collaboration and Lobby Green Deal on electric transport European collaboration in HyER and POLIS European projects: Hybrid User Forum (approved) Clean Fleets (approved) TIDE (approved) E-FACTS E-mobility 3 cities NL Clean City Logistics City 2.0 DELIVER Shanghai Electric Vehicle Center
23
13-8-2015 23 Contact Projectmanager Rotterdam Electric incl. Collaboration and Lobby Lutske Lindeman, +31(0)10 489 6395, l.lindeman@rotterdam.nll.lindeman@rotterdam.nl Charging Infrastructure Arjan Oranje, +31(0)10 489 7239, aj.oranje@rotterdam.nlaj.oranje@rotterdam.nl Innovation Projects and Vehicle Fleets Lode Messemaker, +31(0)10 489 7775, l.messemaker@rotterdam.nll.messemaker@rotterdam.nl Electric 2- and 3-wheelers PM Communication Kim Hooning, +31(0)10 261 1853, k.hooning@rotterdam.nlk.hooning@rotterdam.nl
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.