WITSML IMPLEMENTATION IN ONGC
By Naresh Kumar Oil and Natural Gas Corporation Ltd. India
2
ABOUT ONGC
3
ONGC Operates in diverse logistics In On land & Offshore areas
Oil and Natural Gas Corporation Ltd Corporate Office, Dehradun (INDIA) Registered Office, New Delhi (INDIA) National Oil Company with Asset Based Structure NR ER WR Western Offshore Basin Western Onshore Basin Krishna Godavari Basin CR Cauvery Basin MR CBM BPM Basin Assam & A Arakan Basin Frontier Basin SR Operates in diverse logistics In On land & Offshore areas
6
EPINET PROJECT OF ONGC
7
Integrated E&P Database
Compliance of industry standards & best practices Single validated E & P data base throughout ONGC EPINET OBJECTIVE During past five decades ONGC has carried out extensive exploration, drilling and production activities in the Indian sedimentary basins and over the time has acquired enormous volume of geological, geophysical, logging and engineering data. Like other companies ONGC initiated data management activities way back in 1976, by developing well information system on IBM-370. Furthermore, other systems also emerged at different work centres of ONGC to cater to the data management needs. Eventually, in-house database systems were felt inadequate and required to be replaced with commercial industry standard solution. ONGC in late 1990’s decided to implement the recent advancements of the web based E&P information management technology. ONGC conceived Exploration & Production Information Management and Networking (EPINET) project comprising of people, processes, tools, data and a hierarchy of corporate, regional and working project database in a phased manner. The project is intended to establish an organization wide dynamic, “Virtual” database having GIS features and Web capabilities. Flow of analytical & interpretation Data to EPINET Web based reporting And current E&P data flow into EPINET
8
EPINET Sites & Networking
IDT/ GEOPIC/ OBG Tel Bhawan Frontier Basin, Dehradun E&D Dte Dehradun KDMIPE Dehradun Rajastan Project, Jodhpur Sibsagar Nazira Asset, Nazira IRS/Ahmedabad Asset Ahemdabad A&AA Basin Jorhat Mehsana Asset, Mehsana CBM-MBP Basin Kolkata Cachar Project, Silchar Cambay Project, Cambay W.Onland Basin Baroda Tripura Asset Agartala Ankleshwar Asset, Ankleshwar IOGPT, Mumbai W.Offshore, Basin Mumbai Mumbai High/ Neelam/ Bassien Assets, Mumbai Rajahmundry, Asset Rajahmundry Krishna Godavari, Basin Rajahmundry RO Chennai W A N EPINET System Phase-I Scope Karaikal Asset,Karaikal LAN EPINET System Phase-II Scope Cauvery Basin, Karaikal Blue Site- Phase-I scope Red Site- Phase-II scope
9
EPINET WORK FLOW ASSET/ Forward Base Server ASSET/BASIN INSTITUTES/RGL
- Well Data ASSET/ - Geology Lab. - Reservoir Data Forward Base - Reservoir Lab. - Production Data - Geochemistry Lab. Server - Cultural Data - ML Data BASIN Navigation & Composite Log SERVICES - Bid Monitoring Data - Well - Lease Data - Drilling - Interpreted Data (Basin) BASIN - Interpreted Data ( Instt .) Server - Logging - RGL - Geophysical Post Stack 2D&3D Original Logs Corporate Replica Server Server E&D Dte
10
EPINET Scenario Finder E&P Master LogDB SeisDB AssetDB Other
Forms / Reports Direct PC Access Web Application PROJECT DATABASE SmartMap GIS EPINET DATABASES Finder E&P Master on-line LogDB Log Archival SeisDB Seismic Archival AssetDB Physical Assets Other data- bases
11
WITSML IMPLEMENTATION
12
WITSML FOR REAL TIME OPERATION
13
WITSML FOR REAL TIME OPERATIONS
Well-site / platform ONGC, Paradigm and Halliburton developed a software (2003). Interact & Insite (2004 onwards) LWD/MWD objects. Used for Geo-steering in Mumbai High. Visualization Center (VRC)
14
PANNA MUKTA TAPTI (PMT)
PROJECT
15
PMT PROJECT Introductory Meeting held in Kolkata in Jan 2006 during SPG. Attended by representatives from ONGC, BG & Reliance. It was decided to go ahead with the Pilot in PMT JV because of its multi-operators environment.
16
DATA OBJECTS Data Objects for Stage-I (Drilling+G&G centric)
Log Object (MWD, LWD, Wireline) Well / Wellbore object (well header information) Trajectory object Mud log object Stage-II planned as Production centric
17
PMT PROJECT Status: Developed Fields. EOR/IOR Phase
Now changed idea to implement PRODML which was earlier planned in Stage II.
18
WITSML IN SCADA PROJECT
19
WITSML IN SCADA PROJECT
AN ENTERPRISE-WIDE SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) SYSTEM. WITSML COMPLIANT SERVER.
20
SCADA THREE-TIER STRUCTURE
Corporate Data Center TIER -3 ICE Drilling SCADA at IDT TIER -2 EPINET Offshore Asset Data Center Onshore Asset Data Center EPINET Process Complex TIER -1 GGS HAZIRA Plant CPF Process Complex URAN Trombay CTF Western Offshore Assets Typical On-shore Asset
21
EPINET WORK FLOW ASSET/ Forward Base Server ASSET/BASIN INSTITUTES/RGL
- Well Data ASSET/ - Geology Lab. - Reservoir Data Forward Base - Reservoir Lab. - Production Data - Geochemistry Lab. Server - Cultural Data - ML Data BASIN Navigation & Composite Log SERVICES - Bid Monitoring Data - Well - Lease Data - Drilling - Interpreted Data (Basin) BASIN - Interpreted Data ( Instt .) Server - Logging - RGL - Geophysical Post Stack 2D&3D Original Logs Corporate Replica Server Server E&D Dte
22
THE CHALLENGE
23
SEAMLESS INTEGRATION OF SAP & EPINET WITH SCADA
FROM WITSML COMPLIANT SCADA TIME STAMPED DATA WILL FLOW INTO ICE-SAP FOR BUSINESS COMPUTATIONS. THE E & P DATA WILL FLOW TO EPINET.
24
Managers for Business Information
Integrated SCADA-EPINET-ICE System Managers for Business Information Drilling, G&G, Prod SCADA System MIS Reports 1 Web portal SAP 3 Capture Data End Users Third Eye, IIWS Collaborative Teams Data Historian High Frequency Database Manual entry Ice Transfer Decimated Data ... Epinet Master Data Well References Domain Experts Validation Done at Assets, basins 2 EPINET Team Validate / QC Export validated data in prescribed formats ( templates) to be loaded by the EPINET team Data Loaders (Lab, Institute etc.) Data Transfer Data Access by Users
25
Thank You