Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.

Similar presentations


Presentation on theme: "May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project."— Presentation transcript:

1 May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project

2 SAFETY STUDY PRESENTATION PROJECT LOCATION & DESCRIPTION Tallmadge Road Corridor Parliament Drive to Sunnybrook Road Distance – 1.1 Miles Approximate ADT – Opening Year 2019 – 15,940 Certified Traffic Obtained & Used for Analysis (Certified at 0% Per Year Growth)

3 POR – Tallmadge Road Corridor Study Area SAFETY STUDY PRESENTATION

4 REGIONAL PRIORITY The Congestion Management Process Study published by AMATS in July 2012 lists Congestion Reduction Strategies for various intersections. Listed below is the strategy for the study corridor: I-76 / Tallmadge Road / Mogadore Road Interchange – Reconfigure Interchange. This is the highest crash corridor in Portage County (80 Crashes). Next Closest area is the State Route 59 corridor near the State Route 261 intersection (68 crashes). SAFETY STUDY PRESENTATION

5 CRASH ANALYSIS SUMMARY 80 Crashes Reported in Study Area from 2010 – 2012 43 Rear-end 10 Angle 8 Left Turn 7 Sideswipe - Passing 5 Fixed Object 4 Other Non-Collision 3 Sideswipe – Meeting *Note the High Number of Rear-End Crashes

6 SAFETY STUDY PRESENTATION CRASH ANALYSIS Much Higher than Average Rear-End Crashes Inefficient Cluster Signal Operation at I-76 WB Exit Ramp / Mogadore Road / Tallmadge Road Intersection Non-Traditional Interchange Geometrics at I-76 / Tallmadge Road Interchange Conclusion – Congestion Related Crashes Resulting from Inefficient Operations in Study Area

7 SAFETY STUDY PRESENTATION CRASH ANALYSIS I-76 WB Exit Ramp / Mogadore Road / Tallmadge Road Intersection

8 SAFETY STUDY PRESENTATION LOOKING EAST ON MOGADORE ROAD (WEST)

9 SAFETY STUDY PRESENTATION CRASH ANALYSIS

10 SAFETY STUDY PRESENTATION LOOKING SOUTH ON MOGADORE ROAD (WEST) AT THE I-76 EB EXIT RAMP

11 SAFETY STUDY PRESENTATION CRASH ANALYSIS

12 SAFETY STUDY PRESENTATION LOOKING WEST ON TALLMADGE ROAD AT I-76 EB RAMPS INTERCHANGE

13 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT

14 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 6 Acres Site Trips: 500 Daily Trips

15 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 127 Acres Site Trips: 15,810 Daily Trips

16 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 48 Acres Site Trips: 2,820 Daily Trips

17 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Developable Land: 72 Acres Site Trips: 3,960 Daily Trips

18 SAFETY STUDY PRESENTATION PROPOSED DEVELOPMENT Total Developable Acres: 253 Acres Total Site Trips: 23,090 Trips

19 SAFETY STUDY PRESENTATION PROPOSED COUNTERMEASURES Eliminate both Mogadore Road junctions with the I-76 Exit Ramps to Remove the Mogadore Road / Ramp Overlap Sections Relocate / Reconstruction Mogadore Road (West) to tie into Existing East End Welding Cul-de-Sac Mogadore Road (East) and Reroute all Traffic to Sunnybrook Drive Reconstruct the Traffic Signal at the Reconfiguration Intersection of Tallmadge Road / I-76 WB Ramps. Construct a Traffic Signal at the Newly Created Intersection of Tallmadge Road / Mogadore Road Convert the I-76 / Tallmadge Road Interchange from a Tradition Diamond Interchange Into a Diverging Diamond Interchange Interconnect the Traffic Signals Along the Tallmadge Road Corridor to Form a Coordinated Signal System

20 SAFETY STUDY PRESENTATION PROPOSED IMPROVEMENT

21 SAFETY STUDY PRESENTATION VACANT PROPERTY ON SE CORNER OF TALLMADGE ROAD / I-76 EB INTERSECTION

22 SAFETY STUDY PRESENTATION SYNCHRO MODELS Improved Interchange (Traditional) DDI Interchange

23 SAFETY STUDY PRESENTATION OTHER DIVERGING DIAMOND INTERCHANGES I-270 / Roberts Road Interchange in Columbus, Ohio Opened in Fall of 2013 Seven Total Crashes Between October 26 th and December 31 st, 2013 S.R. 4 / U.S. 68 Interchange in Lexington, Kentucky Opened in Fall of 2011 Two Years Before Opening vs. Two Years After Comparison:  47.8% Reduction in Total Crashes at Interchange  60.9% Reduction in Injury Crashes at Interchange

24 SAFETY STUDY PRESENTATION LEXINGTON KENTUCKY DDI

25 SAFETY STUDY PRESENTATION LEXINGTON KENTUCKY DDI

26

27 SAFETY STUDY PRESENTATION PROJECT COST ESTIMATE AND RATE OF RETURN Total Cost Estimate of All Improvements, Right-of-Way, Construction and Construction Inspection: $7,364,575 Benefit to Cost Ratio on Project: 0.75 Total Safety Funding Request: $4,350,000 Benefit to Cost Ratio on HSP Funding Request: 1.01

28 SAFETY STUDY PRESENTATION CURRENT PROJECT FUNDING PLAN * Local Funding will be Comprised of Funds from Portage County, the City of Tallmadge, Brimfield Township and OPWC Issue I Funds Safety Funding Request:$4,350,00059.1% Future AMATS / CEAO Request:$2,024,99427.5% Funding Type Dollar Amount % of Total Total Project Funding:$7,364,575 Local Funding:$989,581*13.4%

29 SAFETY STUDY PRESENTATION PROPOSED IMPROVEMENT COUNTERMEASURES

30 SAFETY STUDY PRESENTATION CORRIDOR SAFETY STUDY QUESTIONS MICHAEL A. HOBBS, P.E., PTOE GPD DIRECTOR OF TRAFFIC ENGINEERING MARK R. GROSSMAN, P.E. GPD CHIEF HIGHWAY ENGINEER RYAN M. GILLESPIE, P.E., PTOE GPD TRAFFIC ENGINEER CURTIS J. DEIBEL, E.I. GPD TRAFFIC ANALYST ANTHONY ZUMBO, P.E., P.S. PORTAGE COUNTY PROJECT MANAGER


Download ppt "May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project."

Similar presentations


Ads by Google