Download presentation
Presentation is loading. Please wait.
Published byHarvey Greene Modified over 9 years ago
1
Bicycle, Pedestrian, Livability Pedestrian Plan— GIS Analysis APTAC July 2015 Kate Brady
2
Pedestrian Plan Outline Introduction Existing conditions Inventory of existing facilities and policies Safety and crash data Goals, Objectives, Recommended Actions Data collection Usage Rates Facilities Safety Possibly more… Appendices
3
Pedestrian Plan Outline Introduction Existing conditions Inventory of existing facilities and policies Safety and crash data Goals, Objectives, Recommended Actions Data collection Usage Rates Facilities Safety Possibly more… Appendices
4
Pedestrian Plan Outline Introduction Existing conditions Inventory of existing facilities and policies Safety and crash data Goals, Objectives, Recommended Actions Data collection Usage Rates Facilities Map of Priority Areas Efficient investment of limited financial resources Safety Possible more… Appendices
5
End Product Map of Regional Priority Corridors to Guide Investment in Pedestrian Improvements Network Roads only
6
Pedestrian Generators Schools & Bus Stops Parks & Rec Facilities Libraries Walkable Businesses Communities of Concern—Access Communities of Concern—Age
7
Pedestrian Deterrents Pedestrian Crashes, Density Traffic Volume (AADTs) Number of Lanes Low Percent of Sidewalk Coverage Barriers Barrier s:
8
High Generator Score Low Generator Score High Deterrent Score High PriorityIt depends Low Deterrent Score It dependsLow Regional Priority
9
High Generator Score Low Generator Score High Deterrent Score High PriorityIt depends Low Deterrent Score It dependsLow Regional Priority
10
High Generator Score Low Generator Score High Deterrent Score High PriorityIt depends Low Deterrent Score It dependsLow Regional Priority
11
High Generator Score, High Deterrent Score
12
High Generator Score, Low Deterrent Score
13
Low Generator Score, High Deterrent Score
14
Low Generator Score, Low Deterrent Score
15
Pedestrian Generators
17
Pedestrian Deterrents
19
Overall PCI Score
21
Regional Pedestrian Facilities Master Plan Parallel to the Bicycle MP Next steps: Policy and Action Recommendations For ACOG and Member Committees Subcommittee Meeting, July 20, 3:30 PM Assembling the Plan Report Final approval in September
22
Questions & Feedback
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.