1
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1
2
HXU32 Keeper, Pole and Magnet Assembly NEAR SIDE KEEPER NOT SHOWN
3
Keeper Assembly
4
Position Pole #1 1. Assemble Pole #1 to Keeper Rib #1. Use Vertical Spacer to create adjustment gap at bottom of pole. Clamp pole loosely in position, with set screws, approximately on center of rib. NEAR SIDE KEEPER NOT SHOWN
5
Position and Install Pole #1 2. Add Gage Block (in green) and Gage Shim to Keeper Slot #1 as shown. 3. Push Pole in Z direction firmly against gage block and shim to eliminate any gap or space between parts. 4. Clamp pole firmly and permanently in position using set screws.
6
Position and Install Pole #2 5. Remove gage shim. 6. Add Pole #2 with spacer and press firmly in the Z direction against the gage block and Pole #1. 7. Clamp pole firmly in place with set screws.
7
Position and Install Pole #3 8. Add Gage Block #2 to next adjacent slot. 9. Add Pole #3,with vertical spacer, and loosely retain with set screws. 10. Push Pole #3 firmly in Z direction against Gage #2 and other installed parts. 11. Clamp Pole #3 firmly into position with set screws.
8
Position and Install Remaining Poles 12. Repeat steps 2 - 11 for full length of module.
9
Install All Poles Per Steps 1-12.
10
Install All Magnets Between Poles w/Magnet Clamps.