New River Gorge Bridge Fayetteville, WV
2
Presenters Shaun Long – Michael Baker Jr. Inc. Bridge Engineer
Josh Derechin – Michael Baker Jr. Inc Senior Technical Manager Jimmy Wriston – West Virginia DOT
3
Crossing the Gorge Fayette Station Road
Built in 1909, Only way to cross the gorge Corridor L, US19, began in 1960 Tunney Hunsacker Bridge
4
Crossing the Gorge Turn a 45 minute trip into 45 seconds
Making the impossible a reality “new transportation and new life blood” – John D. Rockefeller, IV
5
Bridge was immortalized by US Mint
6
New River Gorge Bridge Design Construction Inspection Tourism
7
New River Gorge Bridge Design Construction Inspection Tourism
8
Design Bridge Types Considered Arch Bridge (Top)
Suspension Bridge (Bottom) Deck Truss
9
Design Manhours for design were equivalent of one man working 40 hours per week for 15 years Design calculation sheets totaled 4,759 Baker engineers checked approximately 1,490 shop drawings Baker engineers analyzed 75+ erection procedures and 1,200 sheets of accompanying calculations
10
Design Features COR-TEN Steel High-Strength Aesthetic Beauty
Lowe Maintenance
11
Bridge Statistics – Record Setting
Upon opening, it was the second highest highway bridge in the world. Royal Gorge Bridge in Colorado built in 1929 Record currently held by Siduhe River Bridge, China ft
12
Bridge Statistics – Record Setting
Upon opening, it was the longest Arch Bridge in the world. 2003 – Lupu Bridge in China broke record
13
Bridge Statistics – Arch Length
Chaotianmen Bridge 1,811 Ft. 2009 China Lupu Bridge 1,804 Ft. 2003 Bosideng Bridge 1,739 Ft. 2012 New River Gorge Bridge 1,700 Ft. 1977 U.S. Bayonne Bridge 1,673 Ft. 1931
14
Bridge Statistics – Arch Height
Zhijinghe River Bridge 1,410 Ft. 2009 China Beipanjiang River Railway Bridge 774 Ft. 2001 Mike O’Callaghan – Pat Tillman Memorial Bridge 886 Ft. 2010 U.S. New River Gorge Bridge 876 Ft. 1977
15
Bridge Statistics – Arch Height
16
Bridge Statistics 34 Million Pounds of Structural Steel Equivalent to 120 Boeing 747’s ,555 Full Size Pick Up’s
17
New River Gorge Bridge Design Construction Inspection Tourism
18
Construction WVDOH awarded a contract to U.S. Steel for the construction of the bridge June 21, 1973 Bid Results $33,984,012 - U.S. Steel $41,116,118 - Allied Structural Steel, Inland Ryerson Construction Products $46,383,282 – Bethlehem Steel Corp. $52,496,017 – Bristol Steel, Iron Works Inc. Most expensive project awarded by WVDOH at the time 2013 cost of bridge $173 million
19
Construction Uniquely Designed Cableway
20
Construction Uniquely Designed Cableway
21
Construction Uniquely Designed Cableway
22
Construction
23
Construction
24
Opening Opened October 22, 1977
Representing Man’s ability to challenge and overcome nature’s barriers
25
New River Gorge Bridge Design Construction Inspection Tourism
26
New River Gorge Bridge Design Construction Inspection Tourism
27
Tourism Foresight to add Visitors center during construction
28
Tourism Bridge Day – Third Saturday in October
29
Tourism