Presentation is loading. Please wait.

Presentation is loading. Please wait.

3. 2 1 Prepared By:- Er. Rabindra Shrestha Er. Samata Shrestha.

Similar presentations


Presentation on theme: "3. 2 1 Prepared By:- Er. Rabindra Shrestha Er. Samata Shrestha."— Presentation transcript:

1 3

2 2

3 1

4 Prepared By:- Er. Rabindra Shrestha Er. Samata Shrestha

5 Eastern DR (Lot 5) Panchthar Taplejung Sankhuwasabha Okhaldhunga Central DR (Lot 4) Dhading Dolakha Ramechhap Western DR (Lot 4) Gorkha Myagdi Mustang MidWestern DR (Lot 3) Humla Jumla Mugu Dolpa Salyan Far Western DR (Lot 2) Baitadi Doti Accham Bajura Bhajang Darchula

6

7

8 Commissioning TrainingInstallation Transportation to Site Hub Clearance and Sorting Distribution to End User Equipment Collection

9 A Sorting and Packing in Centralized Facility B Delivery Planning C Coordination Meeting with REP and CO’s before Installation D Installation E Training and Commissioning

10 Butwal for Lot 2, Biratnagar for Lot 5, Surkhet for Lot 3, Pokhara and Kathmandu for Lot 4

11 Transportation to Road-Head via Truck(over the blacktopped and primary road) Transportation to Sites (secondary roads and foot trails) in Coordination with CO’s and End Users Distribution of Equipments to the End Users by Porters Mobilization of Local People for Transportation

12 Deployment of Installation Team after Delivery of Equipments At least One Local Person to Assist and Receive Basic Installation Training

13 Combined Operation Maintenance Training to End Users, Member of CO and Local People

14 4 Maintaining Coordination among CO’s, End Users and Installation Team 3 Deployment of Huge Installation Team 2 Delivery of Equipments to Respective Sites 1 Sorting and Packing Huge Volume of Equipments

15

16

17

18

19 Time Consumed in Custom Temporary Inaccessibility During Rainy Season Temporary Inaccessibility During Winter Season

20 We have implemented the project on time as per the schedule We are committed to complete the initial allocated projects as well as additional projects with little deviation in allocated time as the number of projects have been increased by 25% We have maintained the high level quality standards as per the contract We have tried to provide maximum benefits to the Locals by providing them opportunities like temporary employment and valuable trainings

21 21


Download ppt "3. 2 1 Prepared By:- Er. Rabindra Shrestha Er. Samata Shrestha."

Similar presentations


Ads by Google