Download presentation
Presentation is loading. Please wait.
Published byFlorence Johnston Modified over 9 years ago
1
Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity
2
Small bowl Big bowl Small bowl Big bowl Lower side Upper side Lower side Upper side long short long short
3
Long side screw to Small bowl Long side screw to Small bowl Small bowl Lower side Small bowl Lower side nut as stopper
4
Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Start to fix outside by a nut
5
Fixed outside by a nutRing mounting Finish lower side (small bowl)
6
Upside down PUF setting PUF center cutting to pass through rod
7
Lower side Small bowl Upper side Big bowl Upper side Big bowl Upper side Big bowl
8
Passive sampler Dry deposition sampler Passive sampler
9
Active sampler Low volume mini pump Passive sampler
10
Active sampler Low volume mini pump Flow meter Thermometer / Humidity Thermo / Humidity recorder Solid phase adsorbent (PS-Air cartridge) Active sampler Low volume mini pump
11
Solid phase adsorbent (PS-Air cartridge) Thermo / Humidity recorder Active sampler Low volume mini pump
12
PUF shipping 1 month later after passive sampler setting
16
PUF shipping
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.