BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering Group Technical Annexes 1 and 2
3
Annex 1: General Requirements for Electrical Overhead and Gantry Cranes Annex 2: PLC Programming and Documentation Requirements March 20th 2014 Handling Engineering Group3
4
Annex 1 General requirements applicable both to new cranes and to new components for refurbishment works on existing cranes Some of the requirements are mandatory while others are applicable only when stated in the technical questionnaire Machine Directive 2006/42/EC and technical questionnaire have priority with respect to this document March 20th 2014 Handling Engineering Group4
5
Annex 1 March 20th 2014 Handling Engineering Group5
6
Annex 1 March 20th 2014 Handling Engineering Group6
7
Annex 1 March 20th 2014 Handling Engineering Group7
8
Annex 1 March 20th 2014 Handling Engineering Group8
9
Annex 1 March 20th 2014 Handling Engineering Group9
10
Annex 1 March 20th 2014 Handling Engineering Group10
11
Annex 1 March 20th 2014 Handling Engineering Group11
12
Annex 1 March 20th 2014 Handling Engineering Group12
13
Annex 1 March 20th 2014 Handling Engineering Group13
14
Annex 1 March 20th 2014 Handling Engineering Group14
15
Annex 2 Covers the following aspects of PLC programming: Design requirements Interface with users Software protection Documentation March 20th 2014 Handling Engineering Group15
16
Annex 2 March 20th 2014 Handling Engineering Group16
17
Annex 2 March 20th 2014 Handling Engineering Group17
18
Annex 2 March 20th 2014 Handling Engineering Group18
19
Annex 2 March 20th 2014 Handling Engineering Group19
20
Annex 2 March 20th 2014 Handling Engineering Group20