Download presentation
Presentation is loading. Please wait.
Published byLorin Page Modified over 9 years ago
1
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA LEVEL MONITORING, P REPARATION OF M ONITORING R EPORTS AND V ERIFICATION C ASE STUDIES AND E XPERIENCE SHARING - E GYPT V EHICLE S CRAPPING AND R ECYCLING P ROGRAMME OF A CTIVITY
2
C ARBON P ARTNERSHIP F ACILITY 2 Training on CDM Operations Plans and Sub-ERPA Contracting Presented by Mr. Juha Seppaelae Mr. Taisei Matsuki Ms. Dina Kordy 01 April 2014
3
C ARBON P ARTNERSHIP F ACILITY 3 Training on CDM Operations Plans and Sub-ERPA Contracting Egypt Vehicle Scrapping and Recycling Program Purpose of PoA is to support the enforcement of Traffic Law #121 (2008) “owners of mass transport vehicles that are greater than or equal to 20 years old are not eligible for new operating licenses or license renewal. “ Mass transport vehicles include: taxis, microbuses and buses.
4
C ARBON P ARTNERSHIP F ACILITY 4 Training on CDM Operations Plans and Sub-ERPA Contracting Programme implementation scheme
5
C ARBON P ARTNERSHIP F ACILITY 5 More number of stakeholders involved in PoA leads to difficulty in CDM monitoring Roles and responsibilities for each stakeholder in CDM monitoring has to be clearly defined Each stakeholders, such as, Ministry of Interior, Vehicle Manufacturers, Vehicle owners, etc. must be educated well on CDM monitoring Training on CDM Operations Plans and Sub-ERPA Contracting Programme implementation scheme
6
C ARBON P ARTNERSHIP F ACILITY 6 In this PoA, the CME (Ministry of Finance) is the CPA implementer too. Hence, both PoA and CPA level monitoring must be done by MOF. Best practice would be to assign regional level / CPA level CDM officers from within the MOF personnel itself. Training on CDM Operations Plans and Sub-ERPA Contracting Programme implementation scheme
7
C ARBON P ARTNERSHIP F ACILITY 7 Training on CDM Operations Plans and Sub-ERPA Contracting CDM registration details Implemented by Ministry of Finance which is the Coordinating/Managing Entity (CME) PoA registered on 11 May 2011 Different CPAs are created for each type of vehicle in each governate Until now, 3 CPAs have been registered for Greater Cairo region
8
C ARBON P ARTNERSHIP F ACILITY 8 Training on CDM Operations Plans and Sub-ERPA Contracting Programmme activities 1.Inspection of old vehicles for program eligibility 2.Surrendering and Scrapping old vehicles 3.Preparation of surrendered vehicles for temporary on-site storage (liquids are drained and batteries are removed) 4.Distribution of subsidy for surrendered vehicles 5.Purchase of new vehicles from independent vendor representatives Contd….
9
C ARBON P ARTNERSHIP F ACILITY 9 Training on CDM Operations Plans and Sub-ERPA Contracting Programmme activities 6.Inspection of new vehicles 7.Licensing 8.Advertising procedures (optional) 9.Program security and monitoring
10
C ARBON P ARTNERSHIP F ACILITY 10 Training on CDM Operations Plans and Sub-ERPA Contracting Process flow diagram from perspective of the vehicle owner MOF must prepare a list of documents needed from each vehicle replacements and must maintain the complete database.
11
C ARBON P ARTNERSHIP F ACILITY 11 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring responsibility and frequency ParameterMonitoring frequencyResponsibility Fuel efficiency of project vehicle Year 1 (2012), Year 4 (2015), Year 7 (2018) Vehicle model manufacturers Number of project vehicles Recorded after a vehicle joins the programme Reported monthly Ministry of Interior Average annual vehicle-km travelled by project vehicles Once in a year through vehicle owners surveyIndependent consulting firm MOF must hire a independent consulting firm to carry out the survey
12
C ARBON P ARTNERSHIP F ACILITY 12 Training on CDM Operations Plans and Sub-ERPA Contracting Monitoring responsibility and frequency ParameterMonitoring frequencyResponsibility Actual age of the baseline vehicle at the time of joining the programme Once when a vehicle joins the programme Reported monthly Ministry of Interior National compliance rate of the Law At the end of each monitoring period (annually) Ministry of Interior / Ministry of Finance Vehicle owner satisfactionPeriodic QA/QC surveys among vehicle ownersMinistry of Finance Proper training shall be provided to Ministry of Interior as well on CDM monitoring and documentation requirements.
13
C ARBON P ARTNERSHIP F ACILITY 13 Training on CDM Operations Plans and Sub-ERPA Contracting Vehicle database management Driver Information: Name, Mobile number, Telephone number Financial Incentive Data: Cheque number, Cheque date Bank Data: Bank letter date, Bank name, Branch Scrapped Vehicle: Vehicle type, Model year, fuel type, License number, Engine number, Chassis number New Vehicle: Vehicle type, Fuel type, Engine number, Chassis number, License number, License date, Scrapping certificate number Database shall be created on CPA basis in each region
14
C ARBON P ARTNERSHIP F ACILITY 14 Training on CDM Operations Plans and Sub-ERPA Contracting Example vehicle database
15
C ARBON P ARTNERSHIP F ACILITY 15 Training on CDM Operations Plans and Sub-ERPA Contracting Vehicle database management Database must be maintained by Ministry of Finance (MOF) - CME Quality control must be undertaken by CDM-Project Manager (PM) Project implementation data must compiled in database every month CDM-Project Manager (PM) must coordinate with vehicle manufacturers, Ministry of Interior for data collection MOF must hire third party consultant to carry out monitoring surveys and compile the survey results
16
C ARBON P ARTNERSHIP F ACILITY 16 Training on CDM Operations Plans and Sub-ERPA Contracting Key responsibilities in CDM monitoring Ministry of Finance - Coordinating and Managing entity (CME) Oversee PoA management and on-site scrapping site management; Designate CDM Project Manager (CDM-PM) Maintain registered project database Arrange baseline survey Arrange annual vehicle owner survey Assess implementation outcomes and data quality, diagnoses the errors and mistakes and improves the program implementation Manages comments and complaints from vehicle owners and drivers (via hotline and periodic survey)
17
C ARBON P ARTNERSHIP F ACILITY 17 Training on CDM Operations Plans and Sub-ERPA Contracting Key responsibilities in CDM monitoring Ministry of Interior (MoI) Provide land for scrapping site Manage initial vehicle inspection Manage scrapping of surrendered old vehicles Manage licensing of new vehicles Provide data necessary for calculating the compliance rate
18
C ARBON P ARTNERSHIP F ACILITY 18 Training on CDM Operations Plans and Sub-ERPA Contracting Key responsibilities in CDM monitoring Other participating entities Participating Banks Participating Auto Dealers Insurance Company Participating Advertising Entities Contractual agreement of MOF with all above entities must be properly stored and would be verified by DOE.
19
C ARBON P ARTNERSHIP F ACILITY 19 Training on CDM Operations Plans and Sub-ERPA Contracting Sampling Plan for Project Emissions Monitoring A. Estimation of fuel efficiency Manufacturers will test their vehicles as follows: One vehicle and fuel type per model used to conduct analysis Test duration must be one week (7 days from Sat to Friday), 10 hours per day. Seasonality adjustment need to be considered during the test (by switching ON A/C during the testing period) Initial and final odometer readings will be noted down in a log sheet Total amount of fuel consumed during the test period is noted “Test must be conducted for every three years”
20
C ARBON P ARTNERSHIP F ACILITY 20 Training on CDM Operations Plans and Sub-ERPA Contracting Sampling Plan for Project Emissions Monitoring B. Average annual vehicle-km travelled Through a vehicle owner survey conducted annually Survey parameter will include: Program participation start date Average weekday distance travelled (km/day) Average weekend distance travelled (km/day) Odometer reading To be carried out by a third party consulting firm Carefully study the sampling population, sample size and methods before the survey.
21
C ARBON P ARTNERSHIP F ACILITY 21 Training on CDM Operations Plans and Sub-ERPA Contracting Egypt Vehicle Scrapping and Recycling Program THANK YOU
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.