Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operation Manual for the 8-Stage Davis Rotating Uniform size- cut Monitor (8-DRUM) Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA.

Similar presentations


Presentation on theme: "Operation Manual for the 8-Stage Davis Rotating Uniform size- cut Monitor (8-DRUM) Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA."— Presentation transcript:

1 Operation Manual for the 8-Stage Davis Rotating Uniform size- cut Monitor (8-DRUM) Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA Group, University of California, Davis *Detection and Evaluation of Long-range Transport of Aerosols (530)752-1120 sscliff@ucdavis.edu mpjimenezcruz@ucdavis.edu tacahill@ucdavis.edu

2 8-DRUM Description Inlet Pump Port Slotted orifice Drum cup 4 5 3 2 1 6 7 8 Drum shaft Air Path Stage #

3 Inlet Installation Lightly greased o-rings w/silicone

4 DRUM cover removal DRUM cover

5 Rotation reset

6 Inserting drums Clear cover #1 Drum (with substrate)

7 DRUM Cleaning (orifice floss) Ethanol strip of paper (~5 mm wide) Orifice

8 DRUM Cleaning (orifice floss) Paper strip

9 Drum Cleaning (drum cups) Ethanol KimWipe

10 Drum Cleaning (back-blowing orifice 1-4) Orifice Clean air duster Air Path Clean air duster Orifice

11 Drum Cleaning (back-blowing orifice 5-8) Orifice Clean air duster Air Path

12 DRUM Cleaning (dusting drum cup) Clean air duster

13 DRUM downloading

14

15 DRUM Vacuum Connection Quick-Connect For pump hose

16 DRUM Pump Connection Quick-Connect For pump hose


Download ppt "Operation Manual for the 8-Stage Davis Rotating Uniform size- cut Monitor (8-DRUM) Steven S. Cliff, Michael P. Jimenez-Cruz, and Thomas A. Cahill *DELTA."

Similar presentations


Ads by Google