Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior.

Similar presentations


Presentation on theme: "Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior."— Presentation transcript:

1 Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior Design Project

2 Spring 2009 ME 481 Outline  Two- vs. Three-Quarter Schedule  General Plan  Design Presentation – Dry Run  Critical Design Review  Ethics Start-Up  Senior Exit Exam (Two-Quarter)  Questions

3 Spring 2009 ME 481 Two-Quarter Schedule  If you are on the two-quarter schedule, this is your last quarter  You must build AND test this quarter  Get and stay busy!  You must have taken ME 463 by the time you get out  You are excused from the in-lab group activities for ME 481

4 Spring 2009 ME 481 Two-Quarter Schedule  You must schedule a weekly group meeting with your lab advisor  You give your Final Design Presentation here at Cal Poly on Wednesday (need to sign up for a time)  You travel to your sponsor’s next week for a Critical Design Review  Your Final Design Report is due this Friday at 5 p.m.

5 Spring 2009 ME 481 Three-Quarter Schedule  Your Final Design Presentation at Cal Poly is next Wednesday (4/8) – need to sign up for a time  Final Design Report is due Friday of third week at 5 p.m.  Critical Design Review at sponsor’s during fourth week

6 Spring 2009 ME481 For Both Groups  You are expected to attend all design presentations given by the teams in your lab section at Cal Poly  See respective syllabi at www.calpoly.edu/~fowen/me428 for deliverables’ due dates www.calpoly.edu/~fowen/me428

7 Spring 2009 ME 481 General Plan (3-Qtr)  We shall meet labs on Mondays to cover issues in engineering ethics  Wednesdays are for weekly meetings with your lab advisors

8 Spring 2009 ME 481 Critical Design Review Make sure your travel forms are current for your trip

9 Spring 2009 ME 481 Ethics Start-Up  Familiarize yourself with the Code of Ethics of ASME and NSPE (National Association of Professional Engineers)  http://files.asme.org/ASMEORG/Governance/3675.pdf http://files.asme.org/ASMEORG/Governance/3675.pdf  http://www.nspe.org/Ethics/CodeofEthics/index.html http://www.nspe.org/Ethics/CodeofEthics/index.html  There are two main assignments:  Team Project – Case Study (20% of ME 481 grade)  Individual Report – Ethics Memo (15% of ME 481 grade)

10 Spring 2009 ME 481 Very Important! Two-quarter students:  Senior Exit Exam: Thursday, 23 April, 6-9 p.m., 10-221, 222, 223  Counts 15% of ME 481 grade  Lab advisors will hand out FE manuals for you to study with

11 Spring 2009 ME 481 Questions?


Download ppt "Spring 2009 ME 481 Laboratory Week #1 Final Design Presentations Mechanical Engineering California Polytechnic State University San Luis Obispo ME481 Senior."

Similar presentations


Ads by Google