1 UNITED NATIONS DEVELOPMENT PROGRAMME HCFC PHASEOUT PROGRAM INTERDEPENDENCY A COMPLICATION IN HCFC PHASEOUT IN FOAMS.

Similar presentations


Presentation on theme: "1 UNITED NATIONS DEVELOPMENT PROGRAMME HCFC PHASEOUT PROGRAM INTERDEPENDENCY A COMPLICATION IN HCFC PHASEOUT IN FOAMS."— Presentation transcript:

1 1 UNITED NATIONS DEVELOPMENT PROGRAMME HCFC PHASEOUT PROGRAM INTERDEPENDENCY A COMPLICATION IN HCFC PHASEOUT IN FOAMS

2 HCFC Control Measures Old vs. New 2

3 PRECONDITIONS TO HCFC PHASEOUT ACCESS TO TECHNOLOGY ELIGIBILITY (61/40) FUNDS SUPPLY 3

4 4 ACCESS TO TECHNOLOGY (1) SUBSTANCEGWPMW  GWP HCFC-141b725117Baseline HFC-245fa1,030134 443 HFC-365mfc794148 279 HFC-134a1,430102 522 Cyclopentane1170 -718 CO 2 /Water144 -725 Methyl formate‘0’60 -725 Methylal‘0’76 -725 FEA-11005164~-718 HFO-1234ze6114~-719 HBA-2<15n/k>-708 AFA-L1<15<134>-708

5 5 ACCESS TO TECHNOLOGY (2) (CFC) HCFC CO 2 HFC HC HCO HFO Red = high ODP/high GWP Yellow = low ODP/high GWP Black = no ODP/high GWP Green = no ODP/low GWP

6 ELIGIBILITY (1) DECISION 61/47 (b): Confirms that the phase-out of HCFC-141b contained in pre- blended polyol systems that were imported and/or manufactured domestically, and counted as consumption under Article 7, was eligible for assistance according to existing guidelines; 6

7 ELIGIBILITY (2) NO ADVANCE PROJECTS ANYMORE PROJECTS NEED TO BE INCLUDED IN HPMP AND MEET STRATEGY PROJECT FORMAT OPEN 7

8 AVAILABILITY OF FUNDS CURRENT FUNDING TRANCHE LIMITED REPLENISHMENT COMPLETELY OPEN EXPECT DELAY/REJECTION FOR PROJECTS NOT NEEDED FOR 2013 COMPLIANCE AND FOR AFTER 2015 COMPLIANCE 8

9 SUPPLY 1.NEED TO INCLUDE SUPPLIER IN PROJECT DESIGN/IMPLEMENTATION 2.POTENTIAL NEED FOR TECHNOLOGY, TRAINING AND FUNDING OF SUPPLIER 3.SUPPLIER MAY BE IN ANOTHER COUNTRY 4.THIS CREATES COMPLICATIONS AND INTERDEPENDENY OF PROGRAMS 9

10 WHAT IS A SYSTEM HOUSE? 10

11 + KNOW HOW! 11

12 WHAT IS A DOWNSTREAM USER? 12

13 THE ISSUE PHASING OUT HCFCs AT DOWNSTREAM USERS USING IMPORTED SYSTEMS NEED ACTION IN THE COUTRY OF EXPORT PHASING OUT HCFCs AT SYSTEM HOUSES NEED ACTION AT DOWNSTREAM USERS INCLUDING THOSE IN OTHER COUNTRIES 13

14 EXAMPLE 1: DOMINICAN REPUBLIC * May relocate to Panama 14 COUNTRY# OF SUPPLIERSMARKET SHARE Mexico270% China225% Spain15%

15 ACTION STATUS –Project submitted to the 62 nd ExCom TECHNOLOGY –Methyl formate base for budget calculations –Recipients allowed accepting other options if these options are zero ODP and low GWP –The MF based budget cost will be applied. Higher costs for the account of the downstream user (or supplier) IMPLEMENTATION –The recipients to be divided into functional groups around their supplier –final choice of technology to be made together with the system supplier –UNDP to provide suppliers with technical information –System suppliers in A5 countries are eligible for funding 15

16 EXAMPLE 2 URUGUAY * System comes from Spain; HCFC-141b added in Argentina 16 COUNTRY# OF SUPPLIERSMARKET SHARE Argentina/Spain*220% Brazil280%

17 ACTION STATUS –Project deferred to 63 rd ExCom TECHNOLOGY –Methyl Formate (MF) base for budget calculations –Recipients allowed other zero ODP/low GWP options –Budget will remain. Higher costs for the account of the downstream user (or supplier) IMPLEMENTATION –MF trials this year –Suppliers informed and cooperation offered –Final choice of technology to be made in January –System suppliers in A5 countries eligible for funding 17

18 CONCLUSION AD HOC DECISIONS MADE FOR CURRENT PROJECTS PROJECTS FOR SYSTEM HOUSES AND DOWNSTREAM USERS NEED COORDINATION CLOSER PROJECT COORDINATION BETWEEN GOVERNMENTS NEEDED 18