Presentation is loading. Please wait.

Presentation is loading. Please wait.

FTTH solutions – General overview

Similar presentations


Presentation on theme: "FTTH solutions – General overview"— Presentation transcript:

1 FTTH solutions – General overview
Hector Mazzochi Product Marketing Manager Prysmian Cavi e Sistemi Telecom srl Viale Sarca 222 – Milano – Italy FTTx Solutions

2 FTTH Impacts our Lives Web 2.0 eLearning eHealth eEntertainment
Society Web 2.0 eLearning eHealth eEntertainment Teleworking Societal eBusiness eHome Environmental eGovernment 2

3 Typical Telecom Architecture
BACKBONE METROPOLITAN RING ACCESS NETWORK

4 Connectivity - Accessories
Product Range Evolution • SM • NZD • MM Optical Fibres • Underground • Aerial (incl. OPGW) • Premises • Blown Fibre Optical Cables • Outside Plant • Exchange • Customer End Connectivity - Accessories

5 Connectivity - Accessories
Product Range Evolution • Bend Insensitive • Reduced Size Optical Fibres INNOVATION • Micromodule • ESFU • Mini Blown Optical Cables INNOVATION • Small Size • High Density • Low Cost Connectivity - Accessories INNOVATION

6 • Bend Insensitive • Reduced Size • Micromodule • ESFU • Mini Blown
Product Range Evolution • Bend Insensitive • Reduced Size INNOVATION • Micromodule • ESFU • Mini Blown INNOVATION System Approach • Small Size • High Density • Low Cost INNOVATION

7 bending around corners network terminations fibre storage
Macrobending Loss : FTTH Today access applications such as FTTH put severe demands on macrobending performance: bending around corners network terminations fibre storage

8 ITU-T G.657A-B and more… CasaLightTM CasaLightTMPlus CasaLightTMXtreme
FIRST : the right FIBRE! CasaLightTM CasaLightTMPlus CasaLightTMXtreme ITU-T G.657A-B and more…

9 MDU Solutions CASALight TM Brownfield Large City MDU dwellings

10 …just fibers into a duct!
The Cable system …just fibers into a duct! The main user cable can contain several ESFUs (Easy Strippable Fiber Units), each of which may contain 1 to 12 optical fibers. Fibers are then routed from the Riser Cable, through a breakout window, when a customer connection is required to be made. The fibre units are protected by a flame retardant LSOH outer sheath.

11 1 2 3 Three steps to get the fiber
The Stripping Tool safely cuts a breakout window in the riser cable, providing access to the fibres. 2 The selected fibre unit (ESFU) can be extracted and cut. This operation is performed some floors above the floor where the customer is to be connected (up to 25 m). 3 At the floor where the fibre connection is requested, the ESFU that was cut on the higher floor can now be easily extracted.

12 Extraction Cable Principle
Cable distribution system (2) n fo microsheath module are extracted from the riser cable through a small window protected by a closure (1). some meters downstream on the riser cable, a second window is open to cut the microsheath module selected for the floor. closure x meters (1) Riser cable n fo microsheath

13 VertiCasa™ Breakout Units
Used to spur off fibres from a Verticasa cable and route them to an alternative tube. Ports available for plugging in 4 and 5 mm drop tubes.

14 Riser installation The Netherland

15 Riser installation Hungary

16 Horizontal installation
Barhein

17 Horizontal installation
Barhein

18 Multiple MDU C.S.I.

19 Multiple MDU CHINA

20 Verticasa – FTTX Example Installation Sites
Riffa Views Int. School, Bahrain FREE, France Hungary Telecom, Hungary STA, Andorra Telecom Italia, Italy Telefonica, Spain Numericable, France Intelligent networking, France Reggefiber, The Netherlands Pipe Networks, Australia Lattelecom, Latvia Dasvyasz, CSI China UNICOM, China

21 Blown Fiber UG Solution
SDU & MDU dwellings

22 Sirocco®– Installation Process
Blown Fibre Principle Air Input Drive Wheels Drive wheels Blown Fibre Tube Air Input Blown Fibre Unit Viscous air drag Blown Fibre Unit Blown Fibre Tube

23 Sirocco® Blown Fibre System – EPFU
2 fibre unit Surface Modification Coloured Optical Fibre Low Modulus Acrylate Rip Cord (2f only) High Modulus Acrylate 4 fibre unit 6 fibre unit 8 fibre unit 12 fibre unit

24 Sirocco® Blown Fibre System – Tube Cables
Up to 24 tubes, each accommodating up to a 12 fibre unit Small diameter, low friction tubes Standard tube size; 5mm OD, 3.5mm ID Note 3mm OD Size not generally recommended due to ease of tube kinking Comprehensive range of jointing accessories Available as; External – Direct Install, Direct Burial, Steel Armour, plus specials Internal – LSOH flame-retardant & UL Riser rated Optimum blowing distance achieved through system approach Compatibility between EPFU, Tube & Installation Equipment achieves best field performance

25 Sirocco® Blown Fibre System – Connectivity
Suitable for 25, 32 & 40mm diameter duct / cable Suitable for 1 day build and retro-fit 90o Tee, Y / H Branch, In-Line Enclosures Blown Fibre Tube Management Outside Plant Applications T Piece Y Branch (Swept T Piece) H Branch Size: (h)350 x (w)250 x (d)100 Apps: Customer connects Size: (h)260 x (w)200 x (d)100 Apps: Customer connects Duct diverse routing Size: (h)400 x (w)190 x (d)100 Apps: Customer connects Duct diverse routing

26 Installation Essentials
Sirocco® Blown Fibre System – Installation Equipment Blowing Head Compressors STILT Tools & Kits Installation Essentials Coiler

27 Sirocco – FTTH Example Installation Sites
BT Group Plc, UK Bezeq, Israel Telefonica, Spain Energis, UK FT, France Slovak Telecom, Slovakia Western Power, Australia FibreSphere, USA Kingston Comms, UK Home Town CATV, USA The Tradition Community, USA DongTan Poong Sung, South Korea IT VÄSTERBOTTEN, Sweden IT NORRBOTTEN, Sweden IT ÖSTERBOTTEN, Finland SEAS NVE, Denmark Energi Midt, Denmark Sydvest Energi, Denmark Oregon Municipality, USA Tellas, Greece NetCologne, Germany Ruhrnet - Westhofen, Germany Neuchatel, Switzerland Hansenet, Germany Song PA, South Korea

28 Preconnectorized UG Solution
SDU & MDU dwellings

29 Customer Lead-In Joint
Preconnectorized UG Solution – CLJ Customer Lead-In Joint Customer access termination that allows the fast and incremental activation of customer services utilizing simple practices. Allows the plug in connection of up to 8 individual customer leads-in cables at the time of service activation. Designed to be cascaded on a single distribution cable for optimized network design.

30 Preconnectorized UG Solution
Lead-In Assembly Installation

31 Preconnectorized UG Solution

32 Preconnectorized UG Solution
Lead-In Assembly Pulling Shroud 100mm 20mm Lead-in Seal Installation Example

33 Quickdraw – FTTH Example Installation Sites
IFNL, UK Midrand Estates, South Africa Rio Tinto, Australia Opticomm, Australia Service Elements, Australia Fujitsu, Australia

34 A cable whose conductor contains 2 optical fibers.
Hybrid NRG+TLC cable solution 3x16mm2 + 2 Optical Fibers G657A A cable whose conductor contains 2 optical fibers. It is able to bring energy and unlimited broadband to the home at the same time. High speed internet, CCTV, TV and satelite TV channels, video-conference are really closer than ever. Now, there is a whole world within the electrical cable!!! 34

35 The fibres are routed through the white pipe to the MDU optical boxes.
In the basement Hybrid Cable from apartments to MDU boxes The fibres are routed through the white pipe to the MDU optical boxes. The electrical cables are terminated in the cabinet after segregating the fibres 35

36 In the apartment 3 1 2 4 36 leaving the right length of cable to
reach the TC panel with the CTB box installing the hybrid cable from the apartment to the basement 1 general view of the in-house electrical panel and Telecom panel where the CTB box is placed 2 4 removing the insulation to separate the fibers from the conductor 36

37 In the apartment 1 2 3 37 separating the fibers from the conductor
fiber length will be enough to reach the CTB box 2 once fibers are duly segregated, copper is cut for ground connection 3 37

38 In the apartment preparing the fibers, cable and conductor with heat shrinkable terminations 1 heating the shrinkable terminations 2 segregation of the fibers from the cable to allow the electrical connection to ground point taking the fibers duly protected to the TC box 3 38

39 finishing the installation
In the apartment preparing the CTB 1 splicing fibers 2 finishing the installation in the apartment 3 39

40 Thanks for your attention !!


Download ppt "FTTH solutions – General overview"

Similar presentations


Ads by Google