ICRI Fall 2011 Convention John Weisbarth- The Euclid Chemical Co. Mick Honek- Geotechniques Inc. Current Methods and Technologies for Repairing Concrete Wastewater Treatment Facilities
2
What’s Unique with WWTP Concrete Repair ?
3
Current Methods and Technologies Specifications Real World Construction Overcoming Installation Challenges
4
Concrete Repair Process Evaluation Correctly Written Specifications Surface Preparation Material Selection Proper Installation
5
Material Properties Compressive Strength Modulus of Elasticity Shrinkage Freeze/Thaw Resistance Bond Strength Flexural Strength Permeability Impact & Abrasion Resistance Coefficient of Thermal Expansion Chemical Resistance Sulfate Resistance
6
Application Criteria Repair Thickness Consistency Set time Viscosity Ease to Place Stickiness Aggregate Extension
7
Materials Patching Mortar Rapid Set Repair Mortar Crack Injection- Epoxy Water Plug Chemical Grout Waterproofing Coating Chemical Resistant Coatings
8
Seal Active Leaks Water Stops Interior and Exterior Below Grade Walls Foundations Reservoirs Manholes Tunnels
9
Seal “Weeping” Walls Waterproofing Coatings Positive or Negative Side Crystalline Hardens in Seconds
10
Urethane Chemical Grout Low Viscosity Urethane Expands Hydrophilic/Hydrophobic Stop Leaking Cracks
11
Crack Repair Non-water Cracks Dynamic Cracks Static Cracks
12
Crack Injection
13
Coatings and Linings Chemical Resistance Flexible High Build
14
WATER & WASTEWATER Challenges & Opportunities … A Contractor’s Perspective
15
Aging Infrastructure Overcoming Installation Challenges Site Access/Mobilization Site Conditions Opportunities
16
Old Structures Lack of Maintenance H 2 S Deterioration Aging Infrastructure
17
Deteriorated concrete Rusted & expanded reinforcing Humidity in work spaces approaching 100% Confined spaces Access-challenged and congested work spaces WTP Challenges
18
Tunnel flow can increase rapidly and unpredictably Intermittently hazardous atmosphere (H 2 S) Permit-required confined space protocols Combined storm & sanitary flow (bio-hazard) Entry by crane & man-basket only Tunnel floor uneven (trip hazards) WWTP Challenges
24
Site Access
25
Confined Work Spaces
26
Equipment Mobilization
27
Jobsite Safety
29
Jobsite Conditions
31
Seal Water Leaks Concrete Repair Epoxy Injection Coatings Opportunities
35
Increasing Your Opportunities Become involved in organizations that provide networking opportunities Provide continuous training for your employees Create project profiles, newsletters, brochures Host an open house Sponsor lunchbox seminars Have a jobsite cookout
36
Commit yourself to high quality work Create relationships Evaluate bidding services When the economy slows, DO NOT cut back your marketing dollars Learn to think so far outside of the box that you’re in danger of losing site of the box Increasing Your Opportunities
37
Success !
40
Current Methods and Technologies for Repairing Concrete Wastewater Treatment Facilities Questions ??