Indirect Plate Heat Exchangers for Cooling Fertilizer offer long term operating performance Neville Jordison Solex Thermal Science Inc. Canada 6 th to 10 th of May 2013. AGADIR MOROCO
2
A Brief History o Indirect Heat Exchanger introduced to the fertilizer industry approximately 25 years ago o Today more than 100 coolers installed in fertilizer plants round the world o Equipment operating successfully in every type of fertilizer - Urea (prills & granules), AN, CAN, LDAN, NPK, MAP, DAP, AS o Company History 1990 - creation of Bulkflow Heat Exchangers – a technology division within Cominco Engineering Services Ltd 1999 - BULKFLOW TECHNOLOGIES is incorporated with headquarters in Calgary, Canada 2008 - Rebranded as Solex Thermal Science Inc to enhance profile as a world leader in the science of heating and cooling bulk solids
3
Advantages compared to Air Cooling (Rotary or Fluid Bed) o Low energy consumption o No air usage – eliminates chillers, fans ducts and scrubber o Compact design o Lower installed capital cost
4
Principle of Operation Combines the science of mass flow with indirect heat transfer Product flows slowly by gravity between water cooled plates Product flows in uniform velocity mass flow Water flows counter-current inside plates Heat Exchange by conduction
5
The Secret to Long Term Operating Performance What causes Caking ? HYGROSCOPIC PRODUCT WATER COOLED PLATES HUMIDITY IN VOID SPACE CONDENSATION CAKING ON PLATES ×
6
The Secret to Long Term Operating Performance Preventing the Caking Mechanism ADD PURGE AIR TO LOWER DEWPOINT CORRECT WATER TEMP PROFILE ELIMINATE CONDENSATION NO CAKING PURGE AIR
7
The Secret to Long Term Operating Performance The CRH Curve
8
The Secret to Long Term Operating Performance Thermal Modelling – Process Input Conditions
9
The Secret to Long Term Operating Performance Thermal Modelling – Output Temperature Profile
10
The Secret to Long Term Operating Performance Ensuring Water Temperature is above the Dew Point Water temperature must be to right of dewpoint line to prevent condensation mechanism
11
The Secret to Long Term Operating Performance Complete System o Tempered Water Module to provide controlled cooling water temperatures o Purge air system controlled flowrate and dewpoint o Instrumentation and Control System
12
Pilot Testing at OCP Jorf Lasfar o DAP o Product Inlet Temperature 65 – 75°C o Maintain discharge temperature below 50°C o Demonstrate long term run capability without caking
13
Pilot Testing at OCP Jorf Lasfar Test Set-up o Double Bank Exchanger o Controlled Cooling Water Temperatures o Purge Air system o Demonstrate long term run capability without caking PURGE AIR PRODUCT IN PRODUCT OUT
14
Pilot Testing at OCP Jorf Lasfar ProductWater Purge Air Steady-State Averages for each run: T° in T° out Rate TOP BANK T° in BOTTOM BANK T° out Run 1 (July 17)66-74°C44-58°C180 kg/h65-72°C43-58°Cyes Run 2 (July 18)71.5-74°C45-46°C230-370 kg/h61°C44-45°Cyes Run 3 (July 20)63-72°C39-44°C200 kg/h58.5-60°C40-45°Cyes Results
15
Pilot Testing at OCP Jorf Lasfar Plate Banks checked after each run o Removable Plexiglas plate o Plate surfaces stayed clean throughout testing
16
Typical DAP Cooler o Product Flowrate:100 t/h o Product Size: 1 – 4 mm o Product Temperature in: 85C o Required Product Temp. out: < 50C o Cooling Water: Cooling Tower at 28C o Purge Air: Required A = 10740 B = 1650 C = 1580 E = 150 F = 1800 G = 2470 J = 1390
17
Typical DAP Cooler o Water Temperature Control Module o Primary water supply can be cooling tower or sea water – use 254SMO or titanium plate heat exchanger o Purge Air Supply o Unit typically installed immediately following the screens
18
Recent Fertilizer Projects CompanyLocationProductCapacity Yara FertilizersPorsgrun, NorwayNPK210 t/h Gemlik GubreGemlik, TurkeyAmm. Nitrate 80 t/h National Fertilizers Jagdishpur, India Urea Prills 2 x 155 t/h Zuari Fertilizers and Chem. Zuarinagar, India NPK 75 t/h JPMCJordan DAP2 x 70 t/h
19
Large urea prill cooler during installation in India
21
Long Term Operating Performance “This campaign the CAN Plant started up on 5 th of June and until now The Solex Cooler hasn’t needed cleaning yet and is operating perfectly”. Quote from Alp Bulent GULES Gemlik Gubre Sanayii A.S. Sept 26 th 2010 Thank you for your attention