Presentation is loading. Please wait.

Presentation is loading. Please wait.

by Ha Do Statistical Standard Methodology and ITC Department

Similar presentations


Presentation on theme: "by Ha Do Statistical Standard Methodology and ITC Department"— Presentation transcript:

1 APPLIED GENERAL STATISTICAL BUSINESS PROCESS MODEL (GSBPM) IN GSO VIET NAM
by Ha Do Statistical Standard Methodology and ITC Department General Statistics Office (GSO)Vietnam General statistic office Vietnam

2 Content Introduction Develop Enterprise architecture (EA) for GSO
Business architecture development: Applied GSBPM in GSO Information architecture development Build application Application architecture development Technology architecture development Findings and conclusions General statistic office Vietnam

3 Introduction Vertical structure: consistent statistical management from central to local levels: 63 PSOs, 708 District statistics offices Statistical data source: reporting regimes, sample surveys/Census, administrative records. GSO conducts around 40 surveys every year Methodology and standard are concerned in all surveys. International standards were applied: ISIC(VSIC), HS… Metadata was built but separated in each domain General statistic office Vietnam

4 Limitations Each department has its own collection methods and no standardized data between survey forms The system of classifications is the weakest element among statistical tools for the development of data production, dissemination and analysis Lack of systematic process to integrate data across GSO departments General statistic office Vietnam

5 Business architecture development - BA(Applied GSBPM for GSO)
Following “Vietnam Statistical Development Strategy and Vision to 2030”. In 2011, GSO had a bidding package to build Enterprise Architecture (EA) under support of WB; EA was applied basing on OIO framework to built BA – business architecture, IA – information architecture, TA – technical architecture and AA - application architecture Follow four strategies: (i) Metadata-Driven Statistical Production; (ii) One Centralized Virtual Database; (iii) Synchronized Data Collection; (iv) Intelligent Statistical Analysis and Modeling General statistic office Vietnam

6 Business architecture development - BA(Applied GSBPM in GSO) cont.
Current statistical processes are quite similar across all departments and consists 5 steps: (1) Survey Preparation / Formulation; (2) Data Collection; (3) Data Processing; (4) Data Analysis; (5) Information Dissemination. Reference: Eurostat SBPM version Designed for all surveys in National survey program Next phase, the model is reviewing for all other resources General statistic office Vietnam

7 Quality management/ Metadata management Information dissemination
GSO SBPM Quality management/ Metadata management Identify needs Prepare collection Data collection Data processing Data analysis Information dissemination Archive Collect and consolidate information needs, check available information Develop survey plan* Interview for data collection Perform data cleaning and verification Analyse entire survey data Draft publishing report Restore survey data* Identify information need to be collected Build metadata Correct data Calculate and integrate data Calculate report Review publishing report Conduct evaluation of process Develop survey sample frame* Create output template Code and classify data Calculate weight Verify survey result Publish statistical product Conduct evaluation of end users Review survey plan Consolidate collected data Produce final report Conduct survey training Input data General statistic office Vietnam

8 Step 1.3 Develop survey sample frame: identify objective and scope of information, sampling design;
Step 2.1 Develop survey plan –survey methodologies; design questionnaire, choose the data collection method; build resource plan (finance, human, equipment), checking and supervisory plans, pilot if any; General statistic office Vietnam

9 Step 7.1 Restore survey data: except restore survey data after data entry, process and analysis step; purpose to categorize data and build data warehouse to support to search statistical information, this step also digitalizes statistical information in document format by using Data Document Initiative - DDI protocol. The questionnaires of several surveys were digitalize when the data entry is used scanning technology. General statistic office Vietnam

10 Information and IT architecture development - IA:
Situation Statistic information is owner in different department Statistic information was supported by more than 35 silo applications and many of them execute similar sets of business processes No integration between applications Solution Needs to be standardized, centralized and follows unique information flow under GSBPM Metadata-driven A configurable workspace application: interface to just ONE GSO IT system Reference methodology: GSIM General statistic office Vietnam

11 General statistic office Vietnam

12 Application architecture development - AA
Three most significant important principles are: (1) Open, service-oriented Application Architecture; (2) Meta-data driven; (3) One Centralized Virtual Database GSO built the System of statistic information collection (SSIC) and Statistical Hub (SH) application to support all steps in the GSBPM. General statistic office Vietnam

13 Information dissemination
Identify needs Prepare collection Data collection Data processing Data analysis Information dissemination Archive Metadata Prepare metadata for survey Begin IT Center Prepare data model Prepare system performance Consolidate collected data Transfer data to SH Transfer to data model Update data mart Transfer data ETL2 data Create OLAP Cube Restore data Finish Department Build survey plan Design data input form Approve survey plan Create report Public report PSO Data entry 13

14 SSIC supports three first steps:
Identify needs (accept metadata management, that is done in SH and integrated with SSIC) Prepare collection Data collection SH supports four last steps: Data processing Data analysis Information dissemination Archive Database is centralized Easily build data input form, data entry is online Support statistician share data between domains, departments Publicize report (OLAP Cube) directly through intranet portal General statistic office Vietnam

15 Technology architecture (TA) development
Technical Reference Model (TRM): defines the group of standards and technologies General statistic office Vietnam

16 Findings and conclusions
Establish the Core team include key persons from all different statistical departments who understand current business process to give situation and problem need to be improved. Choose the Model as reference and customize: 2010, we chose Eurostat GSBMP. International Version 5.0 was released in 2013 Request to have an application support all main steps of GSBPM to keep unique business process between different domains and different departments. Standardize the statistical data is the focus of work and takes time. Metadata-driven is the key to connect all components and statistical indicators that allows to share data and communicate more easily. General statistic office Vietnam

17 CẢM ƠN BẠN General statistic office Vietnam


Download ppt "by Ha Do Statistical Standard Methodology and ITC Department"

Similar presentations


Ads by Google