1 BY MARSALINAWATI HJ OMARALI MARKETING OFFICER marsalinawati.omarali@ports.gov.bn

2 Vision and Mission

3 Multi Purpose Hall Brunei Shell Marketing Bitumen To B.S.B Transit No.3 Transit No.2 A & B Cruise Ship Centre & Transit No. 1 To Bandar Seri Begawan (B.S.B) Reefer Station Container Yard Muara Port Layout CONTAINER TERMINAL CONVENTIONAL TERMINAL 611m 250m Note:- Restricted Areas Workshop CONTAINER YARD Container Freight Station (CFS) CAR PARK CONTAINER YARD CONTAINER YARD Gate House TRAILER PARKING / CONTAINER YARD MUARATOWN INLAND CONTAINER DEPOT (ICD) Muara Export Zone Trailer Parking PORTS DEPT HQ Muslim Graveyard Parking Lots Reefer Station BLOCK 6 BLOCK 5 BLOCK 1 BLOCK 7 BLOCK 3 BLOCK 2 BLOCK 4 Operation Office Water Tank OPEN AREA Ports Department Warehouses Car Park Brusima Cement Silo OPEN AREA CFS CARGO STORAGE AREA Gate House

4 Project Updates

5 Project: Infrastructure / Services Logistics hub Upgrade warehouse into bonded warehouse (ongoing)

6 Hinterland Connectivity Logistics Development Project The important task under current development project : road and waterway 1.ICD 2.Proposed Lumba-Lumba project Benefits: Decrease total logistics cost Alleviate traffic congestion along the road, Reduce pollution

7 ICD Project Muara ( 100% Completed) Sg Tujuh (Under construction) Kuala Lurah ( Completion by January 2010)

8 Muara Container Terminal

9 Project: Infrastructure / Services New International MCT Operator Contract awarded to ICTSI to operate and maintain MCT Operating since 21 May 2009 Increased productivity and efficiency

10 Computerized System (ePort)

11 Project: Infrastructure / Services e-PORT Computerised system to manage port operations. Signed on 21 May 2008. Trial run in December 2009 Go-Live by first quarter, 2010

12 Value Added Services

13 Project: Infrastructure / Services Bunkering Signed 12 Dec 2008 Value-added service for incoming vessels

14 New Facilities/Services

15 Project: Infrastructure / Services Passenger Ferry – Operation since 17 Oct 08 Provide connectivity between Brunei and Malaysia. Facilities: Ticketing Booths Lounge Shops Tourist Information Counter

16 Project: Infrastructure / Services Car Ferry– Operation end of 2009 Connectivity to Labuan and Menumbok, Malaysia. Status: Completed construction in 2008. 2 Coordination Meetings has been held To hold another Coordination Meeting in January 2010.

17 Project: Infrastructure / Services Passenger & Jetty for Bangar, Temburong Foundation Laying – 18 April 2009 Status: Completion by Jan 2010 Objective: To provide better facilities for domestic passengers and cargo transportation.

18 Project: Infrastructure / Services Cruise ship center (Currently serve between 2-4 cruise ship a month before end of 2009)

19 Cruise Liners 2008 FUNCHAL COSTA ALLEGRA SILVER WHISPER PACIFIC SUN C. COLUMBUS CRYSTAL SERENITY AMSTERDAM 2009 COSTA CLASSICA DAWN PRINCESS AIDAcara MV SEABORNE ODYSSEY SEVEN SEAS VOYAGER M/S ASTOR COSTA ALLEGRA DELPHIN VOYAGER C COLUMBUS ARION SUN PRINCESS COSTA ROMANTICA

20 Number of Cruise Ships

21 Projected Growth Cruise Vessels in 2010 = 26 vessels

22 Project: Activities New Website Information Dissemination Daily Updated Shipping & Ferry Schedule Latest Cruise Schedule Tender Information

23 Project: Activities SAFETY CAMPAIGN (Launched 12 Dec 08) ISPS Code (Continuous auditing)

24 Future Development Source: BEDB Pulau Muara Besar

25 Source: BEDB

26 Pulau Muara Besar Development Project Information: Led by Board of Economic Development Brunei (BEDB) Status: Consultants works completion by October 2009

27 Pulau Muara Besar Development Existing Channel Bridge Phase 1 Phase 2 & Beyond Reclaimed Land Source: BEDB 6km 3km

28 Developing PMB PUALA MUARA BESAR 6k m Export Processing Zone Petrochemical, Oil Refinery and other downstream export industries PHASE 2 & BEYOND PHASE 1 Quay length- 700 m straight line Water depth- min 6m draft Capacity- 800,000 TEUs Halal Food Distribution Hub Logistics companies Warehousing Source: BEDB

29 Thank You Further Information: Email: info@ports.gov.bn Website: http://www.ports.gov.bn Marsalinawati Hj Omarali (Lisa) Email: marsalinawati.omarali@ports.gov.bn lisa.omarali@gmail.com