MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Jim Nelson, Iowa DOT
2
Project location IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148
3
Project location
4
Existing structure 40’ x 30’ Steel I-beam Constructed 1930
Reconstructed 1949 Overlay 1968 Retrofit rail 1992 Overlay 1998 1930 plan is 3 sheets 1949 bridge widened and raised. Plan is 3 sheets. Beam is 26 x 85 CB 1998 plan is 9 sheets to overlay bridge 2013 plan is 57 sheets
5
Existing structure Structurally deficient – sufficiency rating is 38.2
Bridge is not adequate for legal loads – posted “One truck at a time.” Girders have section loss, large areas of severe rust and large areas of pack rust. Deck cracking noted – current sounding of overlay does not indicate delamination. Abutment – map cracking and random cracking with efflorescence, large delaminated areas, shallow spalls, exposed reinforcing and severe scaling. 54 Timber piling – original plans are illegible on the length. I would assume 40 feet or so. Stream has degraded 3 feet since the 1949 reconstruction. Scour critical - The footings have been protected with an articulating block mat. Annual inspections are specified.
6
Proposed replacement bridge
Pretensioned Prestressed Concrete Beam Bridge
7
Mobility impacts Detour traffic for duration of construction
7 miles out of distance travel for detour AADT (2012) – 1,460 w/ 16% trucks User costs for 180 day detour Indirect $437,000 Direct $15,000 (Co. Road Maint. & Detour Signing) Original concept was 180 day detour. – Reduced to 9 day critical closure with $10,000/day. We were looking for a solution to that would reduce mobility impact time to what the FHWA describes as a tier 3 ABC solution. Took the mobility impact down from entire construction season of several months to under 2 weeks. User costs for 9 day critical closure $22,000.
8
Project staging area 120’ BTC (45”) with 6 beam cross section.
9
Utah DOT WANSHIP BRIDGE SLIDE
Utah completed this as a tier 1 project where traffic on Eastbound I-80 over a secondary road was detoured for less than 24 hours.
10
Bridge construction visualization
11
Semi-integral abutment
Abutment Diaphragm Details – sheet number 14
12
Sliding pad Superstructure Details – sheet number 15
Bonded PTFE surface on bearing pad detail
13
Project cost Let April 16, 2013 Winning bid $1.3 Million
Bridge unit cost - $112/SF Historic bridge unit cost - $85/SF
14
Critical closure schedule
15
Massena lateral bridge slide web site
The web site contains project information, an extended construction visualization, a live project web camera and the contract documents including plans and specifications.
16
Construction progress
17
acknowledgements Designer – Iowa DOT
Constructability Review – Michael Baker Corporation ABC Peer Exchange – Utah DOT ABC Detail Testing – Iowa State University Construction Administration – Iowa DOT Prime Contractor – Herberger Construction Co., Inc. Precast Wing Supplier – Cretex Concrete Products Precast Beam Supplier – Cretex Concrete Products HfL Grant – FHWA Baker – Salt Lake City, UT Herberger Construction Co., Inc. – Indianola, IA Cretex Concrete Products – West Des Moines