SETUP IMPROVEMENT
2
Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first good piece of the next job. In essence, Setup considers the ACTIVITES and TIME SPAN from GOOD PIECE (A) to GOOD Piece (B)
3
What setup reduction is not Not to reduce set-up people –A 50% reduction in setup time will not lead to a 50% reduction in setup people. Typically no reduction in setup people. Not to produce more product –(except when capacity is a issue)
4
WHY Reduce Setup times? Key reason is to Reduce Lot Sizes Reduced WIP Reduce Lead Time Better Quality Flexibility
5
Work Content Breakdown Ex. Preparation, after-process returns, and checking of raw material, blades, dies, jigs, gauges, etc. Mounting and removing blades, fixtures, chucks, etc. Centering, dimensioning, & setting of other conditions Trial run & Adjustments 30% 5% 15% 50%
6
Two Kinds of Setup Activity Internal –Can be performed only when the machine is shut down, or process is not producing. External –Can be performed while the machine is running, or process is producing.
7
Fundamental Rule If an ACTIVITY can be done with the process is running (externally), then it should be done while process is running.
8
Where to Start Bottlenecks Short Lead-time Customer Complaints Delivery
9
Guidelines & Tips Review and Document current layout & process –Data Collection The complexity of the job change will determine how many observations needed View complete change over whenever possible Simulate change over when feasible Video Record Process Map Fishbone
10
Guidelines & Tips Evaluate process, look for possible enhancements. Incorporate the operator, supervisor, processor, setup person, etc. in the evaluation. Separate internal and external activities Reduce internal activities by doing more work externally Brainstorm for improvements
11
Guidelines & Tips Reduce/improve both internal and external activities –Internal Standardize Fixtures Locating Pins Standardize die heights Predetermined X-Y coordinates in CNC machines Standardize & improve clamping methods Reduce the number of bolts
12
Guidelines & Tips Standardize bolt heads Cut off unnecessary threads U-Washers SPC - Pre-control charts T-slot and U-slots in base plates –External Eliminate adjustments - potential 40% to 50% Maintenance of tools, gages & fixtures
13
Guidelines & Tips Preset tools and position dies Assign additional people to setup when feasible Pre-stage all items - Die carts, tool boards –get tooling, fixtures, dies, and molds Dismantle and repair items Clean up Return tooling What paperwork/necessary computer information Reduce internal activities by doing more work externally
14
Guidelines & Tips Coordinate and plan external work –Create a Setup Chart –Color code fixtures and tool –Code location and description of dies –Locate storage as close as possible –Start preparation before the last part is run –Plan for extra manpower
15
Guidelines & Tips KEEP AN OPEN MIND, ASK “ WHAT IF” Test ideas and measure results Implement improvements Document the new process
16
In Conclusion Quick reaction to the DEMANDS of the market is critical. The ability to give your customers WHAT, WHEN & HOW MUCH they want is essential. Efficiently changing from one job to another job is a MUST.
Similar presentations