Download presentation
Presentation is loading. Please wait.
Published byAlvin Austin Modified over 9 years ago
1
John Miller
2
Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦ Improve community
6
Sediment Fence Barrier ◦ Fence with geotextile fabric to hinder flow of sediment Grass Buffer Strip ◦ Wide strips of undisturbed vegetation consisting of grass or other resistant plants surrounding disturbed site Stone Bag Inlet Protection ◦ Stone filled woven bags place around drainage inlets
7
Rock Check Dam ◦ Gravel or rock buildup in channels to slow down flow of runoff Downspout Extender ◦ Piping to move downspout outlet away from erodible soil, yard Erosion Control Blanket ◦ Woven from selected material and tactically placed to slow water flow
8
Dams Channels Sea Walls Levees Etc.
9
In the Alleghany Highlands of western Virginia Backs up the Jackson River for 12 miles to create Lake Moomaw Created by Army Corps of Engineers Part of the Flood Control Act of 1946 Construction lasted from 1974-1979 Reservoir was filled by 1982
10
Flood protection of industrial, commercial, and residential properties Saves lives and money for residents and business owners
12
Rock fill embankment Impervious Earthen Clay core 1,310 ft. Long 257 ft. high 1000 ft. wide at base
13
180 cu. Ft./ sec water flow Checked regularly by engineers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.