Mark Faulkenberry Webinar for … Colorado Geo Energy & Heat Pump Association February19, 2013.

Similar presentations


Presentation on theme: "Mark Faulkenberry Webinar for … Colorado Geo Energy & Heat Pump Association February19, 2013."— Presentation transcript:

1 Mark Faulkenberry Webinar for … Colorado Geo Energy & Heat Pump Association February19, 2013

2

3

4 Blue Canyon74.3 MW Buffalo Bear18.9 MW Red Hills123 MW Rocky Ridge150 MW (Commercially available Jun 2012) Total366 MW Once Rocky Ridge is operational approximately 17% of WFEC annual energy production will come from wind!

5 CASPER Cross Air State Pollution Rule 30 M project on CC NG units EPA Regulation  Regional Greenhouse Gas Initiative  Clean Air transport Rule  Hazardous Air Pollutant  Coal Combustion Residual (Coal ash)  Clean Water Act

6 30 MW in Reduced Capacity 30,000 kW @ $1850/kW = $55,000,000 Principal only … No carbon costs considered … Sacrifice energy sales for capacity reduction …

7 You can lead a horse to water … But you can’t make him drink!

8 Big difference between SEER & EER

9 Listening to consumers …  Cost  Urgency Issues  Education Change “stereo-typical” GS home

10 1 kWh of energy from the grid Plus: 3-5 kWh of energy from the earth Yields: 4-6 kWh of energy for the building Another form of utility “plant” for delivering Renewable Energy to the load

11  Co-op partners to become a premiere “Thermal Energy Services Provider”  Co-op installs, owns, and maintains loop for fixed monthly service fee added to electric bill  Co-op contracts with 3 rd party for construction and maintenance of the loop  Co-op provides low interest financing for equipment, installation, & basic energy efficiency improvements (insulation & seal) Note: the financing will be limited to positive cash flow applications and only offered through pre-approved installers.

12 Customer HVAC Contractor Loop Contractor Electric Cooperative New Role for Electric Cooperative

13 Cost for System 3 Ton System 200ft/ton + 100 ft. = 700 ft. 700 ft. x $7/ft. = $4900 4 Ton System 200ft/ton + 150 ft. = 950 ft. 950 ft. x $7/ft. = $6650 Using RUS Financing 3 Ton $18-$25/month Tariff Rate 4 Ton $25-$28/month

14 System Cost 3 Ton (Less Loop) $10,000 Less WFEC Rebate $ 1,200 Total Loan $ 8,800 Less 30% Fed Credit $ 2,640 Net Balance $ 5,800 Note: Additional 30% State Tax Credit in NM Amortized Cost $8,800 @ 3% (10 years) $84.97/month

15 Projected Annual Savings $3,830/yr. Using Geo Design Software Less Annual TSC Costs $ 300/yr. $25/mo. x 12 months Less Facilities Payments $1,019/yr. $84.97/mo. x 12 months Cash Flow Positive $2,511/yr. Sample used: 2400 sq. ft. (15 yr. old) – STD EFF 10 SEER

16 Projected Annual Savings $1,959/yr. Using Geo Design Software Less Annual TSC Costs $ 300/yr. $25/mo. x 12 months Less Facilities Payments $1,019/yr. $84.97/mo. x 12 months Cash Flow Positive $640/yr. Sample used: 2400 sq. ft. (15 yr. old) – STD EFF 10 SEER

17

18  Caddo Electric Cooperative First out of the gate … Huge Success New Construction & Retrofits  Roosevelt EC - 1st to offer services in NM  Kiamichi seeking Board Approval in Feb  Seven (7) other co-ops planning to present to their Boards by mid year.  Numerous others awaiting the results of Geo Validation Project

19 Research to validate the 0.65 kW/ton Largest “Testimonial” advertising campaign in our cooperatives history Imagine...  25 retrofit installations (Volunteers)  Spreading across two states  All sub-metered to acquire actual before and after demand reduction  All coordinated to flip the week of July 29

20 Estimated Project Cost $315,000 The Players  WFEC and our co-op family  Cooperative Research Network (CRN)  Verbal commitments for financial support from ClimateMaster & Bosch … Water Furnace considering …  Looking for other financial support

21  Found a “Strategic Partner” with extensive experience with GSP installations.  Participating cooperatives will work with said entity through their “Key Accounts” programs and targeted consumer groups  Third party will engineer, bid out installations, and oversee the entire project thus assuring quality installation. Dairy Pilot in New Mexico

22 Must match replacement time frame Each “pre-approved” dealer must submit a plan for dealing with urgency issues - Summer- Portable Cooling Tower - Winter -Utilize backup heat strip and offer a $50 credit for the month utilized Equipment inventory has to be addressed

23  Internal – Family Buy-in Shared Vision … leading the way Custom Business Plans  GSHP Manufactures & Dealers Unbiased … We want competition Determining who wants to play …  External – General Public No brainer when the system goes out Fall of 2012 effort … “Go Go Geo Challenge”

24

25 Title Sponsor Touchstone Energy Cooperatives of OK Co-Sponsors 1. ClimateMaster 2. Bosch – (Florida Heat Pump) 3. Water Furnace Other Industry “Beneficiaries”

26 The goal is to challenge high school juniors and seniors to use their creativity in the production of a 1-3 minute video which delivers our message. How Geo Works – Overview of incentives currently available Savings Benefits – Renewable –– Environmental benefits Then by using their social media network … deliver our message to all of their friends and family as they go online and view/vote for their favorite videos

27  Co-op & GSP dealers promote ….within their “Service Territory” (No cost to the co-op or dealer other than sweat equity)  Entire program is managed online (website) - intro video - rules & entry process - message to be delivered - general research information on GSHP  Students submit videos online  Videos previewed before posted  All videos posted at the same time for voting

28

29 REGIONAL COMPETITIONSTATE COMPETITION  Five (5) Regional competitions winner from each advancing to state finals  Top Five (5) vote getters are judged  Winner Scholarships 1 st Place - $3000 2 nd Place - $2000 3 rd Place - $1000  1st place winners school awarded $2500  Finalist videos posted for finals online voting  State Finalists come to OKC for interviews  Judges interview finalists and score the group  Winner Scholarships 1 st Place - $7000 2 nd Place - $3500 3 rd Place - $2000  1st place winner school awarded $2500

30 Michael Ming Oklahoma Secretary of Energy Betty Thompson Miss Oklahoma Stephen McKeever Oklahoma Secretary of Science & Technology

31 Online voting 25 points (Ranges from 25-10) Message delivery35 points (5 pts per message) Creativity- Wow25 points Technical Merit10 points Videography 5 points Total100 points Finals criteria will be modified to include interview scores