Download presentation
Presentation is loading. Please wait.
Published byCordelia Phelps Modified over 9 years ago
1
Install new air cooled high efficiency screw chiller (variable speed) Install new fan coils with ECM motors and low temperature heating coils and proper outside air connection Install new high efficiency condensing boilers Install controls to do CW and HW temperature reset
2
Change both CW and HW systems to variable flow Install dedicated outside air units with energy recovery device Consider add thermal storage on the chilled water system Change to water cooled chiller and add water side economizer
3
Consider a new control system Install occupancy sensors in class rooms
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.